Site Final | 8/27/2008 | 8/27/2008 | 8/27/2008 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 7/30/2008 | 7/30/2008 | 7/30/2008 | A | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
Random Inspection | 2/28/2008 | 2/28/2008 | 2/28/2008 | A | PART |
Clint A Smith
|
|
|
Left a message for Robert Bruno (RP) in regards to construction entrance of lot. Waiting on a call back. Will re-inspect on Monday the 3rd. CAS#460 ###-####
|
Issue & PRINT permit SFD | | | 12/14/2007 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/13/2007 | | 12/13/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 11/19/2007 | | |
|
|
|
|