Site Final | 11/2/2009 | 11/2/2009 | 11/2/2009 | A | PASS |
Bill VanDegrift
|
|
|
|
Site Final | 1/29/2009 | 1/29/2009 | 1/29/2009 | P | PART |
Tom Arcoraci
|
|
|
site has not been revegetated yet
|
Site Preparation | 1/28/2009 | 1/28/2009 | 1/28/2009 | P | PART |
Bill VanDegrift
|
|
|
site looks fine no landscaping yet
|
General Inspection | 11/5/2008 | 11/5/2008 | 11/5/2008 | A | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine no landscape started
|
Conference | 10/15/2008 | 10/16/2008 | 10/16/2008 | A | DONE |
Clint A Smith
|
|
|
Spoke with owner over general clean up on the project area and getting an understanding on what phase they are in for lot developement. Also told him to provide a concrete washout pit and clean up lots of concrete and morter wash. Also to provide an RP for the project area.
|
Random Inspection | 10/15/2008 | 10/15/2008 | 10/15/2008 | P | FAIL |
Dixie Fellows
|
|
|
set up a conference for clint to meet with new owner so he can go over the esc requirements
|
BMP Violation | 6/18/2008 | 6/25/2008 | 6/26/2008 | A | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 6/18/2008 | 6/18/2008 | 6/18/2008 | P | FAIL |
Clint A Smith
|
|
|
Spoke with RP. D.I. needs to be protected. Tracking off of lots must be swept up. All trash debris must be containerized of taken off of site. CAS #460
|
Issue & PRINT permit SFD | | | 12/28/2007 | | DONE |
|
|
|
|
Application received | | | 11/23/2007 | | |
|
|
|
|