Site Final | 1/22/2009 | 1/22/2009 | 1/22/2009 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 6/26/2008 | 6/26/2008 | 6/26/2008 | A | PART |
Clint A Smith
|
|
|
Told them to clean up track out at washout. Also to dig a pit for the next time they pour. CAS #460
|
General Inspection | 6/3/2008 | 6/3/2008 | 6/3/2008 | A | PASS |
Mike Kinnear
|
|
|
sign posted, di covered site entry ok
|
Site Preparation | 3/14/2008 | 3/14/2008 | 3/14/2008 | P | PASS |
Clint A Smith
|
|
|
Site has been stabilized. Was an exsisting project. Pit run has been put down with 3/4 gravel for the entrance discussed with RP over time line of project and was told that project perimeter is hand swept when needed. CAs#460
|
Issue & PRINT permit COM | | | 1/29/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/7/2007 | | 12/7/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 11/27/2007 | | |
|
|
|
|