DOC - Permit Expired | | | 9/16/2009 | | DONE |
Tisha Gallop
|
|
|
expired building permit
|
General Inspection | 4/29/2009 | 4/29/2009 | 4/29/2009 | P | PART |
Steven Webb
|
|
|
Reviewed necessary requirements for stabilization including removal of d.i. protection and debris from site and making sure the bare ground has achieved 70% of vegetation or other acceptable measures.
|
Random Inspection | 1/28/2009 | 1/28/2009 | 1/28/2009 | P | PART |
Steven Webb
|
|
|
Verbal to RP (Jim-###-####). Drop inlets are in need of maintenance.
|
General Inspection | 10/6/2008 | 10/7/2008 | 10/7/2008 | A | DONE |
Clint A Smith
|
|
|
Went over the perventitive measures with the RP to get there site ready for the winter.
|
Routing - Erosion and Sediment | 1/18/2008 | | 1/18/2008 | | DONE |
|
|
|
ESC plan was approved under this permit. Also includes BLD08-00074. Informed contractor that filing the NOI with EPA is required for this project above the local ESC requirements.
|
Issue & PRINT permit COM | | | 1/7/2008 | | |
|
|
|
|
Routing - Erosion and Sediment | 12/11/2007 | | 12/11/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 11/27/2007 | | |
|
|
|
|