Permit Information
Permit NumberESC07-01486
StatusExpired
Name FRANK JONES
Site Address 8134 N PIERCE PARK LN
Project Name***GRADING-DRIVEWAY***
Customer Number 
ePlanReview 
Description
IMPLEMENTATION OF SWPPP PRIOR TO ANY OTHER LAND DISTURBING ACTIVITIES. NO VERTICAL CONSTRUCTION ALLOWED UNDER THIS PERMIT.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired12/30/201012/30/201012/30/2010PPASS
DetailsClint A Smith
General Inspection12/30/201012/30/201012/30/2010PDONE
DetailsClint A Smith
Permit is being doc expired due to no activity past 365 days. Stuctural controls still inplace. No threat of structure controls are.
Change Status (ISS)  12/30/2010 DONE
changed back to issue per clint smith
DOC - Permit Expired7/7/20107/7/20107/7/2010PPASS
DetailsDixie Fellows
Aging Inspection7/6/20107/6/20107/7/2010 PEND
DetailsDixie Fellows
BMP Violation12/17/200912/31/200912/31/2009APART
DetailsClint A Smith
Due to weather conditions, unable to inspect if correction have occured. Will re-inspect at the first melt of the year.
General Inspection12/17/200912/17/200912/17/2009PFAIL
DetailsClint A Smith
Verbal Message to RP:
Maintain al BMP's that are in need of maintenanceand releave BMP's that holding over 50%of compacity. Also need to fill in all gullies that have developed and find a BMP that will miniumize the effect of rilling on the slopes. Will reinpect on 12/31/09am.
General Inspection12/1/200912/9/200912/9/2009APASS
DetailsSteven Webb
Road has sediment barrier in place and road rills have been repaired.
General Inspection12/4/200912/8/200912/8/2009ACANC
DetailsClint A Smith
Cannot reach project.
General Inspection12/3/200912/4/200912/4/2009ACANC
DetailsClint A Smith
Conference9/25/20099/28/20099/28/2009ADONE
DetailsClint A Smith
Verbal to RP: Maintain BMP's and repair where rills and gullies have formed.
Conference9/25/20099/28/20099/28/2009ADONE
DetailsSteven Webb
Meet with Mr. Skip Jones over winterization of subdivision. Inspected site, comments forwarded to C. Smith to pass along with RP. Maintain BMPs on road (northeast side of drainage). Repair gullys and install small amount of energy reduction devices. Overall vegetation has been re-estabilished nicely next to the road plus silt fence is still in place between the road and drainage which should prevent turbid runoff from entering drainage area.
Random Inspection6/8/20096/8/20096/8/2009PPASS
DetailsClint A Smith
Will re-inspect on Sept. 15th.
General Inspection3/24/20093/24/20093/24/2009APASS
DetailsClint A Smith
All bmp's are installed correctly and are working well.
General Inspection2/17/20093/6/20093/9/2009APASS
DetailsClint A Smith
Random Inspection2/17/20092/17/20092/17/2009PDONE
DetailsClint A Smith
Did not view entire project due to access point locked off. No issues present on the west end of project area.
Site Preparation1/13/20091/20/20091/21/2009APASS
DetailsClint A Smith
Gate locked and no activity
Site Preparation1/6/20091/13/20091/13/2009APASS
DetailsJames Rogers
Site Preparation12/30/20081/6/20091/6/2009APASS
DetailsJames Rogers
Conference12/31/20081/6/20091/5/2009ADONE
DetailsSteven Webb
Discuss with Skip Jones regarding re-vegetation of site. Informed SGW that 10 acres had been re-seeded in Oct. 08. Additional seeding will be taking place in spring 09. Respraying of initial area will be performed in spring if bare areas are observed. Structual measures to be installed/inspected and maintained to reduce erosion until final stabilization is achieved. Skip Jones is primary RP
General Inspection12/31/200812/31/200812/31/2008PPART
DetailsSteven Webb
Area has been mulched and tackified, (not seeded). RP (P. Warner) is no longer primary RP. Warner is a sub-contractor. Will follow up with primary RP-Skip Jones. voice mail was given to Skip, waiting on return call.
Site Preparation12/23/200812/30/200812/30/2008APASS
DetailsJames Rogers
Site Preparation12/16/200812/23/200812/23/2008APASS
DetailsJames Rogers
Site Preparation12/9/200812/16/200812/16/2008APASS
DetailsJames Rogers
Site Preparation12/9/200812/9/200812/9/2008APASS
DetailsJames Rogers
Random Inspection10/21/200810/21/200810/21/2008PDONE
DetailsClint A Smith
Spoke with Rp over the project and where it stand. They getting ready to winterize the project and will stay in touch.
Random Inspection6/30/20086/30/20086/30/2008PPASS
DetailsClint A Smith
Site is not active right now but all BMP's are in good condition.
CAS
#460
Conference12/4/200712/5/200712/5/2007ADONE
DetailsSteven Webb
Meet with RP & Contractor: Reviewed site, need bmps installed per plan. Discussed dewatering, cons. entrance, sediment barriers and need to stabilize bare ground when construction ceases over 14 days. NOI by developers has been filed, contractor has yet to file. Requested that 48 hour notice of intent to start construction be given when ready.
Issue & PRINT permit COM  12/5/2007 DONE
Application received  12/3/2007  
Routing - Erosion and Sediment12/3/2007 12/3/2007 PASS
ESC plan approved with attached conditions.
General Inspection6/8/20099/15/2009 A 
DetailsClint A Smith
Winterization.
Routing - Erosion and Sediment12/3/2007    
PLANS TAKEN TO MARLENE.