Site Final | 8/26/2008 | 8/26/2008 | 8/26/2008 | P | PASS |
Tony Young
|
|
|
|
General Inspection | 8/18/2008 | 8/18/2008 | 8/19/2008 | P | FAIL |
Pat Lass
|
|
|
bariers were removed and dirt was tracking to storm drain called RP and she said she wouls rectify it today
|
General Inspection | 7/29/2008 | 8/4/2008 | 8/4/2008 | A | PASS |
Clint A Smith
|
|
|
Site cleaned up. No issues present. CAS
|
General Inspection | 7/25/2008 | 7/29/2008 | 7/29/2008 | A | PART |
Clint A Smith
|
|
|
Need to maintain bmp's along front and clean up the drive way. Site is clean. CAS
|
Random Inspection | 6/9/2008 | 6/9/2008 | 6/9/2008 | A | PASS |
Daryl Spivey
|
|
|
BMP's in place and sign posted.........ds
|
BMP Violation | 6/3/2008 | 6/5/2008 | 6/6/2008 | P | PASS |
Clint A Smith
|
|
|
Issues with notice have been corrected. CAS #460
|
General Inspection | 6/3/2008 | 6/4/2008 | 6/4/2008 | A | PASS |
Clint A Smith
|
|
|
Rp infor has been updated. CAS #460
|
BMP Violation | 6/3/2008 | 6/3/2008 | 6/3/2008 | A | FAIL |
Clint A Smith
|
|
|
Notice of correction. 1Re-install sediment barrier at front of lot. 2. Clean up all sediment on sidewalk and gutterpan. Will re-inspect on 6/5/08 for these issues. ** Update RP info on project (24hr Notice) CAS #460
|
Issue & PRINT permit SFD | | | 2/11/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 1/18/2008 | | 1/18/2008 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 1/15/2008 | | |
|
|
|
|