Permit Information
Permit NumberESC08-00064
StatusFinaled
Name RYAN WARD
Site Address 1787 N CLOVERDALE RD
Project Name 
Customer Number 
ePlanReview 
Description
the other address is 1575 cloverdale rd
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final3/25/20094/8/20094/8/2009APASS
DetailsSteven Webb
Follow up: Contact Ryan Ward at ###-####-Central Paving
Site Final3/25/20093/25/20093/25/2009PPART
DetailsSteven Webb
West side of property has not achieved 70% of undisturbed area. Will re-inspect in two week and notifiy R. Ward at Central Paving.
Site Preparation3/13/20085/13/20085/13/2008PPASS
DetailsClint A Smith
Area is under street construction and no issues seen.
CAS
#460
Random Inspection3/17/20083/17/20083/19/2008PFAIL
DetailsClint A Smith
No stabized entrance on the south side of Fairiew. Discussed with RP over the situation and also Steve Webb discussed the situation over getting this issue corrected. It is not suffient to just sweep street when track out occurs. It must be pervented with an access control.
CAS#460
Site Preparation3/13/20083/13/20083/14/2008PPART
DetailsClint A Smith
Construction entrance installed on one side of project need to install proper entrance on the other side of fairview. Everything slopes into project, no perimeter protection needed. Basin installed but not complete. Needs to have a soil stabilizer to all disturbed soil.
CAS #460
Conference2/29/20083/3/20083/3/2008APART
DetailsClint A Smith
Met with Ryan Ward (RP) went over the timeline of project regarding the erosion and sediment control measures and practices. Discussed with Ryan over Construction entrances on and off of porject area. Explained to him that some type of geotexile fabric is manditory as underlayment for the rock entrance. There are multiple entrances on project that are temporary for access. So i explaned if they are not being used then they need to be blocked off. These temporary entrances will be gone in about a week due to utility construction. A Construction entrance will be made during this period in Constuction.
CAS#460
###-####
Issue & PRINT permit COM  1/31/2008 DONE
Application received  1/29/2008  
Routing - Erosion and Sediment1/29/2008 1/29/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions.
PLANS/APPL TAKEN TO FRONT DESK  1/29/2008  
Telephone call  1/29/2008 DONE
lft vm with ryan ward ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  1/29/2008 DONE