Permit Information
Permit NumberESC08-00086
StatusFinaled
Name JAMES LARKIN
Site Address 3811 W NEZ PERCE ST
Project Name 
Customer Number 
ePlanReview 
Description
This esc plan is for the over-all subdivision site development.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled10/21/200810/21/200810/21/2008PPASS
DetailsClint A Smith
General Inspection6/6/20086/6/20086/6/2008PFAIL
DetailsClint A Smith
Verbal Notice
Need to contain or remove ALL trash debris on project area. Spoke with RP to get this done.
Will re-inspect on 6/11/08 in the AM.
CAS
#460
Random Inspection5/20/20085/20/20085/20/2008AFAIL
DetailsClint A Smith
Need to pick up trash at all lots and project area. Sweep up street after storm drains are installed. Also protet the irragation ditch at the west end of project.

CAS
#460
Random Inspection4/21/20084/21/20084/21/2008PPART
DetailsClint A Smith
Site looks ok. Need to pickup trash pile around lots. Will be completed this week.
Talked with RP over the issue.
CAS
#460
Tracking Control4/9/20084/9/20084/9/2008PPART
DetailsClint A Smith
Minor tracking off of project. RP said it will be cleaned up by tomorrow. Site is looking good.
Random Inspection4/2/20084/2/20084/2/2008APART
DetailsClint A Smith
Discussed with RP over additional trash containers for each building. To pick up debris piles and place them into a container.
Also to mover his ESC sign to the build that they are for and to place them on the front og the building
CAS
#460
Tracking Control3/19/20083/19/20083/19/2008PPART
DetailsClint A Smith
Tracking off of project onto Nes Perezz. Talked with RP over clean up. Told I would give till the end of the day. Also to try acces control.
CAS#460
Random Inspection3/6/20083/6/20083/6/2008PPART
DetailsClint A Smith
Discussed with RP over re-stabilizing construction entrance after back fill pile are removed at the end of the entrance. Very light sediment coming off of project. But is swept by hand on a daily basis.
CAS#460
###-####
Site Preparation2/14/20082/14/20082/14/2008PPASS
DetailsClint A Smith
Site has perimeter bmps in place. Plan has been ammended for wattles instead of silt fence.
Stabilizedconstruction entrance has been properly installed.
Sigh has been posted at Temp power pole at the left side of project and not at entrance due to evoding vandlism or theft os sign. I have approved this location.
Site has passed inspection. "Stop Work Order" has been pulled. Work can commence as of 2/15/08
CAS
#460
Site Preparation2/12/20082/13/20082/13/2008PCANC
DetailsClint A Smith
not ready yet
Conference2/13/20082/13/20082/13/2008APART
DetailsClint A Smith
Met with Jim Larkin (project super) and Jim Pickard (ACHD). Discussed with them over sidewalk and and road improvements. Also to figure out where construction entrance will be located for access.
Will do a follow-up inspection for site preperation when Jim Larkin contacts me when perimeter control has been established. Then the "Stop Work Order" can be released.
CAS
#460
Routing - Erosion and Sediment2/12/2008 2/12/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions.
PLANS/APPL TAKEN TO FRONT DESK  2/12/2008  
Telephone call  2/12/2008 DONE
tlk to Jim Larkin that permit and fees are ready to picked up
Permit Ready to Issue  2/12/2008 DONE
Issue & PRINT permit COM  2/12/2008  
Application received  2/11/2008