Site Final | 11/23/2009 | 11/23/2009 | 11/24/2009 | P | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 10/30/2009 | 10/30/2009 | 10/30/2009 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/2/2009 | 10/2/2009 | 10/2/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
Tracking Control | 5/7/2009 | 5/11/2009 | 5/11/2009 | A | PASS |
Bill VanDegrift
|
|
|
cleaned up ok
|
Tracking Control | 5/6/2009 | 5/7/2009 | 5/7/2009 | A | FAIL |
Bill VanDegrift
|
|
|
poor job washing the street lastnight, will wash again ths evening and will sweep saturday, will also clean dorian and streets west of the west enterance.
|
Random Inspection | 5/6/2009 | 5/6/2009 | 5/6/2009 | A | FAIL |
Bill VanDegrift
|
|
|
mud and tracking on to street, talked to contractor who is sweeping this evening.
|
Complaint Inspection | 3/2/2009 | 3/2/2009 | 3/2/2009 | A | DONE |
Clint A Smith
|
|
|
No issues present. ent over procedures contractor and what actually occured.
|
Site Preparation | 2/13/2008 | 2/19/2008 | 2/19/2008 | A | PASS |
Clint A Smith
|
|
|
stabilized entrance installed crrectly and sediment control (wattle) installed.
CAS #460 ###-####
|
Telephone call | | | 2/13/2008 | | |
|
|
|
lft ms with greg ###-#### that permit is ready to be picked up
|
Permit Ready to Issue | | | 2/13/2008 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 2/13/2008 | | |
|
|
|
|
Routing - Erosion and Sediment | 2/12/2008 | | 2/13/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/13/2008 | | |
|
|
|
|
Application received | | | 2/12/2008 | | |
|
|
|
|