Site Final | 10/7/2008 | 10/7/2008 | 10/8/2008 | P | PASS |
Steven Webb
|
|
|
|
General Inspection | 8/13/2008 | 8/13/2008 | 8/13/2008 | A | PART |
Clint A Smith
|
|
|
Told Rp to clean up spoil piles on site of concrete. CAS
|
General Inspection | 6/9/2008 | 6/9/2008 | 6/9/2008 | P | PART |
Mike Kinnear
|
|
|
sign posted & cobles at entry
|
Random Inspection | 6/6/2008 | 6/6/2008 | 6/6/2008 | P | PASS |
Jim Storey
|
|
|
esc is not grouped to bld permit ?
|
Site Preparation | 4/30/2008 | 4/30/2008 | 4/30/2008 | A | PASS |
Clint A Smith
|
|
|
perimeter protection installed and will be using the front project for access. CAS #460
|
Site Preparation | 3/28/2008 | 3/31/2008 | 3/31/2008 | P | CANC |
Clint A Smith
|
|
|
canceled. Will be given a call by the RP when everything is setup and they are ready to go. Should be here in about two weeks CAS#460
|
Issue & PRINT permit COM | | | 3/24/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/14/2008 | | 3/14/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. Also Bld08-00470.
|
Application received | | | 3/5/2008 | | |
|
|
|
|