Site Final | 7/23/2008 | 7/24/2008 | 7/24/2008 | A | PASS |
Jim Sly
|
|
|
|
Random Inspection | 7/23/2008 | 7/23/2008 | 7/23/2008 | P | CANC |
Jim Sly
|
|
|
Donovan Waldenmyer
|
General Inspection | 7/21/2008 | 7/21/2008 | 7/21/2008 | P | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
Random Inspection | 7/7/2008 | 7/7/2008 | 7/7/2008 | A | PART |
Jack Frank
|
|
|
ok
|
Site Preparation | 6/19/2008 | 6/20/2008 | 6/20/2008 | P | PASS |
Jim Sly
|
|
|
Donovan ###-####.......Re-insp......Sweep street, and add filter in drain. Done OK
|
Site Preparation | 6/19/2008 | 6/20/2008 | 6/20/2008 | A | FAIL |
Jim Sly
|
|
|
Donovan ###-#### Called Donovan (RP) advised him that the parking lot next to construction site has a lot of soil and sand on it, and drain inlet does not contain a filter. Will re-inspect 6-20-08 PM.
|
Issue & PRINT permit COM | | | 6/11/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/3/2008 | | 4/3/2008 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions. Will need a certified RP prior to permit issuance.
|
Application received | | | 3/12/2008 | | FAIL |
James Rogers
|
|
|
Need RP certification prio to waiver consideration.
|