General Inspection | 1/26/2009 | 1/26/2009 | 1/26/2009 | | DONE |
Clint A Smith
|
|
|
Moved to a site final.
|
Site Final | 1/26/2009 | 1/26/2009 | 1/26/2009 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 11/24/2008 | 11/24/2008 | 11/24/2008 | A | PASS |
Pat Lass
|
|
|
|
General Inspection | 10/10/2008 | 10/10/2008 | 10/10/2008 | A | PASS |
Jack Frank
|
|
|
|
General Inspection | 10/1/2008 | 10/1/2008 | 10/1/2008 | P | PASS |
Eric Strole
|
|
|
bmp's in order
|
Random Inspection | 8/14/2008 | 8/14/2008 | 8/14/2008 | P | PASS |
Mike Jordan
|
|
|
ESC permit sign posted. Noted proper containment for excavagted dirt.
|
Site Preparation | 8/8/2008 | 8/8/2008 | 8/8/2008 | A | PASS |
Mike Jordan
|
|
|
ESC permit sighn posted, limited excavation work, all excavation is in interior portion of bldg. site was clean.
|
Issue & PRINT permit COM | | | 7/28/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/4/2008 | | 4/4/2008 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions.
|
Application received | | | 4/2/2008 | | |
|
|
|
|