Site Final | 10/14/2008 | 10/28/2008 | 10/28/2008 | A | PASS |
James Rogers
|
|
|
Front and rear landscaping in, site over 80% stabilized.
|
Site Preparation | 9/30/2008 | 10/14/2008 | 10/14/2008 | A | PASS |
James Rogers
|
|
|
Landscaping in progress
|
Random Inspection | 9/30/2008 | 9/30/2008 | 9/30/2008 | P | PART |
James Rogers
|
|
|
Site cleanup in progress.
|
Random Inspection | 8/8/2008 | 8/8/2008 | 8/8/2008 | A | PART |
Mike Jordan
|
|
|
Needs to sweep sidewalk and driveway. Also needs to clean up construction debri from jobsite. c/n posted.
|
General Inspection | 8/4/2008 | 8/4/2008 | 8/4/2008 | P | PASS |
Mike Jordan
|
|
|
sign was posted. All bmps still in place. site was clean.
|
Complaint Inspection | 8/4/2008 | 8/4/2008 | 8/4/2008 | P | CANC |
Mike Jordan
|
|
|
|
General Inspection | 7/30/2008 | 7/30/2008 | 7/30/2008 | P | PASS |
Mike Jordan
|
|
|
sign posted, bmps ok.
|
Random Inspection | 7/29/2008 | 7/29/2008 | 7/29/2008 | P | PASS |
Mike Jordan
|
|
|
Sign was posted, all bmps in place, site clean.
|
BMP Violation | 7/14/2008 | 7/21/2008 | 7/21/2008 | A | PASS |
Clint A Smith
|
|
|
Trash container provided. All concrete has been cleaned up off of lot. CAS 460
|
Site Preparation | 7/7/2008 | 7/14/2008 | 7/14/2008 | A | FAIL |
James Rogers
|
|
|
A Notice of Violation issued. Concrete washout on front of construction site is NOT APPROVED. Concrete washout has gone into canal and into gutter.
No concrete washout unless in an approved container. Each violation can be fine @ $300.00 each.
This is a second notice.
|
Site Preparation | 7/1/2008 | 7/8/2008 | 7/7/2008 | A | PASS |
James Rogers
|
|
|
See previous. Grading crew on site. Discussed with them keeping sidewalk and street swept.
|
BMP Violation | 6/23/2008 | 6/30/2008 | 7/1/2008 | A | PASS |
James Rogers
|
|
|
See previous notice. Discussed sidewalk sweeping and construction debris cleanup with Kathy at ###-####. She has provided a concrete washout container on site.
|
Site Preparation | 6/23/2008 | 6/23/2008 | 6/23/2008 | P | FAIL |
James Rogers
|
|
|
Discussed 8-17 violations with RP, Kathy Wraspir. 1. BMP to be placed on S. side of property to prevent sediment from gettin onto property at 1117 Shamrock. 2. Concrete washout BMP to be provided on site.
Violations to be corrected by close of business on 6-27 or a stop work may be issued.
|
Site Preparation | 5/30/2008 | 6/2/2008 | 6/2/2008 | A | PART |
Bob Reichert
|
|
|
###-#### straw still in yard, note from rp saying they will come back and take care of today, also note stating yellow card being mailed
|
Site Preparation | 5/30/2008 | 5/30/2008 | 5/30/2008 | A | FAIL |
Jack Frank
|
|
|
ph # ###-#### called talked with PP told her she needs bmps in place, card posted, filter for storm drain will check back 06-02-08
|
Issue & PRINT permit SFD | | | 4/17/2008 | | DONE |
|
|
|
|
Application received | | | 4/11/2008 | | |
|
|
|
|