Site Final | 9/29/2008 | 9/29/2008 | 9/29/2008 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/19/2008 | 6/19/2008 | 6/19/2008 | A | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 6/19/2008 | 6/19/2008 | 6/19/2008 | P | PASS |
Eric Strole
|
|
|
bmp's in order.
|
Site Final | 6/19/2008 | 6/19/2008 | 6/19/2008 | A | FAIL |
Clint A Smith
|
|
|
Site is not fully stabilized. When they have completed the path back to the lake a informed them to call for a site final then. CAS #460
|
Random Inspection | 5/20/2008 | 5/20/2008 | 5/20/2008 | P | PART |
Clint A Smith
|
|
|
site looks good. Need to add protection to one D.I. where they are stockpiling materail. Fixing as my inspection progressed on. CAS #460
|
Site Preparation | 5/2/2008 | 5/2/2008 | 5/2/2008 | A | PASS |
Clint A Smith
|
|
|
Sign posted at entrance to back of lot. All BMP's installed correctly CAS #460
|
Routing - Erosion and Sediment | 4/17/2008 | | 4/21/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC08-00323
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2008 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 4/21/2008 | | DONE |
|
|
|
|
Application received | | | 4/17/2008 | | |
|
|
|
|