Site Final | 9/19/2008 | 9/19/2008 | 9/19/2008 | P | PASS |
Dave Hannah
|
|
|
Ok to final per phone call with Dave Hannah
|
DOC - Permit Finaled | | | 9/19/2008 | | DONE |
|
|
|
|
Site Preparation | 9/3/2008 | 9/3/2008 | 9/3/2008 | A | FAIL |
Dave Hannah
|
|
|
call concrete forman told him to get ahold of rp no site protection on excavation excavator called me he will get right down to site and fix problem
|
Site Preparation | 7/25/2008 | 7/25/2008 | 7/25/2008 | P | PASS |
Clint A Smith
|
|
|
All work is ineterior T.I.. No issues present. CAS
|
Issue & PRINT permit COM | | | 7/24/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/2/2008 | | 5/2/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 4/30/2008 | | |
|
|
|
|