Site Final | 8/15/2008 | 8/15/2008 | 8/15/2008 | A | PASS |
Clint A Smith
|
|
|
All work pertaining with soil disturbance has been completed and area was brought back to what it was prior. CAS
|
Random Inspection | 7/28/2008 | 7/28/2008 | 7/28/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 7/22/2008 | 7/22/2008 | 7/22/2008 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Site Preparation | 6/4/2008 | 6/5/2008 | 6/5/2008 | A | DONE |
Clint A Smith
|
|
|
Discussed with the RP over the issues pertaining with what work will be going on. CAS #460
|
Issue & PRINT permit COM | | | 6/3/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/29/2008 | | 5/29/2008 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions.
|
Routing - Erosion and Sediment | 5/8/2008 | | 5/8/2008 | | FAIL |
Steven Webb
|
|
|
Contractor identified but RP listed on application is not certified.
|
Application received | | | 5/6/2008 | | |
|
|
|
|