Permit Information
Permit NumberESC08-00400
StatusFinaled
Name JASON STEWARD
Site Address 610 W JULIA DAVIS DR
Project Name 
Customer Number 
ePlanReview 
Description
Rehabilitation of approximately 900 ft. of existing Greenbelt pathway along the Boise River behind the BSU campus dormitory and Morrison Center.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final11/5/200811/5/200811/5/2008APASS
DetailsClint A Smith
Site Final10/20/200810/27/200810/27/2008ANR
DetailsClint A Smith
Still completing the project.
Site Final10/13/200810/20/200810/20/2008AFAIL
DetailsClint A Smith
Drop inlet protection still in place
General Inspection10/13/200810/13/200810/13/2008PDONE
DetailsClint A Smith
Left a with the RP when the temporary BMP's will be removed for a site final. Will check on 10/20/08.
General Inspection9/30/20089/30/20089/30/2008APART
DetailsClint A Smith
Still need to apply a stabilization product to the denuded soils under the overhang. Permit will not be finaled until all disturbed soil is stabilized.
General Inspection9/22/20089/24/20089/24/2008PDONE
DetailsClint A Smith
Hydro -seeding was applied very lite. Recommended that they strengethen the puondage of mix when they come back to apply the rest of the area along the river.
General Inspection9/22/20089/22/20089/22/2008PCANC
DetailsClint A Smith
Appling a hydro-seed today on the disturbed soil. Will re-inspect on 9/24/08.
General Inspection9/17/20089/17/20089/17/2008 PART
DetailsClint A Smith
Spoke with RP.
Need to pick the excess chain link at the bottom of the awning. Also need to get all disturbed soil next to the river stabilized with a tachifier and a native seed mix.
CAS
Tracking Control8/29/20089/2/20089/2/2008APART
DetailsClint A Smith
Site swept up but with the landscaping work, they are generating more sediment onto the hard surfaces. But will be cleaned when finished.
CAS
Tracking Control8/29/20088/29/20088/29/2008PFAIL
DetailsClint A Smith
Need to clean up all hard surfaces of sediment and debris before the storms coming through this weekend. Will re-inspect on 9/2/08.
CAS
General Inspection8/25/20088/25/20088/25/2008APASS
DetailsClint A Smith
No issues. Minor amounts of sediment on the hard surfaces. No other issues present.
CAS
General Inspection8/14/20088/14/20088/14/2008APASS
DetailsClint A Smith
Prior issues have bee corrected. No issues today.
CAS
BMP Violation8/4/20088/6/20088/6/2008APASS
DetailsClint A Smith
Concrete residue is clean and D.i. have been maintained.
CAS
General Inspection8/4/20088/4/20088/4/2008PFAIL
DetailsClint A Smith
Verbal Notice:
Clean up all residue from sawcutting in the gutterpan. Also clean all D.I.'s on the project area. Will re-inspect 8/6/08
CAS
460
General Inspection7/28/20088/4/20088/4/2008ACANC
DetailsJames Rogers
Random Inspection7/31/20087/31/20087/31/2008PPART
DetailsClint A Smith
Need to still clean up sediment on hard surfaces next to the bridge. D.I. protect next to the Morrison Center building.
CAS
General Inspection7/28/20087/28/20087/28/2008AFAIL
DetailsClint A Smith
Need to clean up all hard surfaces from sediment. Maintain D.i. on project area.
CAS
General Inspection7/2/20087/2/20087/2/2008PPASS
DetailsClint A Smith
All Bmps are in good shape. Starting to excavate the area by the Morrison Center.
CAS
460
General Inspection6/17/20086/24/20086/23/2008APASS
DetailsClint A Smith
Additional BMP's were added along the river and there is secondary protection on the drain inlet with in the project area. Contacted ACHD over the clearing out of sediment and debris at the outfall pipe next to the bridge that relieves straight to the river.Concerned with the disturbed soil that is bare going to the river no sediment protection what so ever.
CAS
460
BMP Violation6/13/20086/17/20086/17/2008APART
DetailsClint A Smith
All drains have been protected out by the Morrison Building. Maintenance required on drain inside the project area. Recommend additional protection of a sediment bmp along certain areas of the river where the soil is sitting above the wattle that already is exsisting.
Will re-inspect on 6/24/08
CAS
#460
Complaint Inspection6/13/20086/13/20086/13/2008PFAIL
DetailsClint A Smith
Notice of Correction
Need to protect 2 drian inlet next to the Morrison building.
Will re-inspect on 8/17/08
CAS
#460
Random Inspection6/13/20086/13/20086/13/2008PFAIL
DetailsClint A Smith
Notice of Correction
Need to protect 2 drian inlet next to the Morrison building.
Will re-inspect on 8/17/08
CAS
#460
General Inspection6/3/20086/3/20086/3/2008PPART
DetailsSteven Webb
Overall site looks good; Need to protect interior drop inlets. Rain was occurring during inspection and noticed sheet flow on hard surface carring sediment. Need to sweep hard surface to reduce sediment. River side of project has protection. Concrete washout is signed and in place.
Random Inspection5/30/20085/30/20085/30/2008PPASS
DetailsClint A Smith
site looks good.
CAS
#460
Site Preparation5/16/20085/16/20085/19/2008PPASS
DetailsClint A Smith
Site looks good all perimeter controls are inpplace. They are putting secondary protection on a stock pile next to the river. Sign posted at front of project access.
CAS
#460
Site Preparation5/19/20085/19/20085/19/2008PPASS
DetailsDaryl Spivey
walked thru with Clint and did not see any problems....ds
Routing - Erosion and Sediment5/7/2008 5/8/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions.
PLANS/APPL TAKEN TO FRONT DESK  5/8/2008 DONE
DetailsSteven Webb
Telephone call  5/8/2008 DONE
DetailsCathy Brown
lft vm with phil johnes ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  5/8/2008 DONE
Issue & PRINT permit COM  5/8/2008 DONE
Application received  5/7/2008  
DetailsTisha Gallop