General Inspection | 9/29/2008 | 9/29/2008 | 9/29/2008 | | DONE |
Clint A Smith
|
|
|
Moved to a site final.
|
Site Final | 9/29/2008 | 9/29/2008 | 9/29/2008 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/27/2008 | 8/27/2008 | 8/27/2008 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 6/25/2008 | 6/25/2008 | 6/25/2008 | P | PASS |
Mike Jordan
|
|
|
Sign posted. BMPs ok. Majority of excavated material ok. Site was clean.
|
Application received | | | 5/16/2008 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 5/16/2008 | | DONE |
|
|
|
|