Site Final | 9/2/2008 | 9/3/2008 | 9/3/2008 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/8/2008 | 8/8/2008 | 8/8/2008 | P | PART |
Clint A Smith
|
|
|
Site looks good. Minor sediment on the hard surface in the back of project. CAS
|
General Inspection | 7/29/2008 | 8/4/2008 | 8/4/2008 | A | PASS |
Clint A Smith
|
|
|
Drain protected. No issues on site. CAS
|
Site Preparation | 7/22/2008 | 7/29/2008 | 7/29/2008 | A | PASS |
Clint A Smith
|
|
|
Site looks good. Trey will have the parking lot drain protected by the end of the day. CAS
|
Site Preparation | 7/16/2008 | 7/22/2008 | 7/22/2008 | A | NR |
Clint A Smith
|
|
|
Will re-inspect in a week. CAS
|
Site Preparation | 7/16/2008 | 7/16/2008 | 7/16/2008 | P | NR |
Clint A Smith
|
|
|
Will re-inspect next week. CAS
|
Issue & PRINT permit COM | | | 7/15/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/5/2008 | | 6/5/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
Routing - Erosion and Sediment | 5/29/2008 | | 5/29/2008 | | FAIL |
Steven Webb
|
|
|
Did not receive a ESC plan or a plan waiver request letter. Informed applicant.
|
Application received | | | 5/16/2008 | | |
|
|
|
|