Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC08-00463
StatusFinaled
Name GLEN CARSTEN
Site Address 800 W DIAMOND ST
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/16/20096/17/20096/17/2009APASS
DetailsJim Storey
Site Preparation10/17/200810/20/200810/20/2008PPASS
DetailsClint A Smith
All drain inlets are protected with approved protection
General Inspection10/17/200810/17/200810/17/2008PPART
DetailsSteven Webb
Sign is posted but drop inlets are still not protected and debris still in parking lot. If not corrected by end of the weekend a stop work order may be issued.
Site Preparation10/15/200810/15/200810/15/2008PPART
DetailsSteven Webb
Verbal to RP, storm drain d.I.'s need inserts, removal large plywood crates from parking lot and then sweep up debris before a rain occurs. Post yellow sign.
Random Inspection9/15/20089/22/20089/22/2008APASS
DetailsClint A Smith
Random Inspection8/25/20089/15/20089/15/2008ACANC
DetailsJames Rogers
General Inspection9/15/20089/15/20089/15/2008APASS
DetailsMike Kinnear
sign posted site looks fine
Tracking Control8/11/20088/25/20088/25/2008APASS
DetailsJames Rogers
General Inspection8/13/20088/13/20088/13/2008PPASS
DetailsMike Kinnear
sign posted site looks fine
Random Inspection8/1/20088/11/20088/11/2008APASS
DetailsJames Rogers
Site Preparation8/1/20088/1/20088/1/2008APASS
DetailsJames Rogers
Mostly interior remodel.
Random Inspection7/28/20087/28/20087/28/2008PPASS
DetailsJim Storey
Site Preparation7/8/20087/15/20087/16/2008APASS
DetailsClint A Smith
Site Preparation7/1/20087/8/20087/8/2008APASS
DetailsJames Rogers
Site Preparation7/1/20087/1/20087/1/2008AFAIL
DetailsJames Rogers
CN issued to RP Glen Carsten at ###-####.
1. 2 storm drains in front parking lot to have silt sack installed.
2. Porta Pot to be placed on grassy area.
3. If concrete work is to be done a concrete washout area is required.
4. Storm drains (2) into swales to be restored to maintain free driveway drainage.
5. General sweeping of driveway and parking lot, including gutters.
Site Preparation6/24/20086/24/20086/24/2008PPASS
DetailsJim Storey
Issue & PRINT permit COM  6/23/2008 DONE
Routing - Erosion and Sediment6/9/2008 6/9/2008 PASS
DetailsClint A Smith
ESC plan waiver approved with attched conditions.
Application received  5/23/2008