Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC08-00474
StatusFinaled
Name MICHAEL SPROUFFSKE
Site Address 651 E GOWEN RD
Project Name651 E GOWEN RD
Customer Number 
ePlanReview 
Description
Plan Designer is Scott Sherrow who is enrolled to re-certify PD on 6-25-08 see attached email
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final12/5/200812/5/200812/5/2008APASS
DetailsJim Storey
General Inspection12/5/200812/5/200812/5/2008APASS
DetailsMike Kinnear
sign posted site looks fine
General Inspection12/1/200812/1/200812/1/2008APASS
DetailsMike Kinnear
sign posted site looks fine
General Inspection ESC11/19/200811/19/200811/19/2008 PASS
DetailsClint A Smith
General Inspection11/3/200811/3/200811/3/2008APASS
DetailsMike Kinnear
sign posted site looks fine
BMP Violation10/20/200810/24/200810/24/2008APASS
DetailsClint A Smith
General Inspection10/23/200810/23/200810/23/2008APASS
DetailsMike Kinnear
sign posted site looks fine
General Inspection ESC10/20/200810/20/200810/20/2008 FAIL
DetailsClint A Smith
Spoke with RP to have all issues corrected by 10/23/08.
1. Protect all Drain inlets within the paved area.
2. CLean up all hard sufaces of any sediment and debris. Will re-inspect on 10/24/08.
General Inspection10/3/200810/3/200810/3/2008APASS
DetailsMike Kinnear
sign posted site looks fine
General Inspection9/29/20089/29/20089/29/2008APASS
DetailsMike Kinnear
sign posted site being asphalted looks fine
General Inspection ESC9/25/20089/25/20089/25/2008 PASS
DetailsClint A Smith
General Inspection9/10/20089/10/20089/12/2008APART
DetailsClint A Smith
No tracking issues. Told RP to clean up gutterpan.
CAS
General Inspection9/10/20089/10/20089/10/2008APASS
DetailsMike Kinnear
sign posted & site looks fine
Random Inspection9/2/20089/2/20089/2/2008PPASS
DetailsJim Storey
General Inspection9/2/20089/2/20089/2/2008PPASS
DetailsMike Kinnear
sign post site looks fine
General Inspection8/29/20088/29/20088/29/2008APASS
DetailsMike Kinnear
sign posted site looks fine
General Inspection8/28/20088/28/20088/28/2008PPASS
DetailsMike Kinnear
sign posted site looks fine
Random Inspection8/27/20088/27/20088/27/2008PPASS
DetailsJim Storey
north east wall pannels rebar ok pending si concrete reports.
General Inspection8/25/20088/25/20088/25/2008APASS
DetailsMike Kinnear
sign posted site looks fine
Random Inspection8/22/20088/22/20088/22/2008PPASS
DetailsJim Storey
General Inspection8/21/20088/21/20088/21/2008APASS
DetailsMike Kinnear
sign posted site looks fine
Random Inspection8/19/20088/19/20088/19/2008PPASS
DetailsJim Storey
Random Inspection8/18/20088/18/20088/18/2008APASS
DetailsJim Storey
General Inspection8/18/20088/18/20088/18/2008APASS
DetailsClint A Smith
No tracking or any other issues. Site looks good.
General Inspection8/15/20088/15/20088/15/2008APASS
DetailsMike Kinnear
sign posted site looks fine
Random Inspection8/14/20088/14/20088/14/2008PPASS
DetailsJim Storey
Random Inspection8/12/20088/12/20088/12/2008APASS
DetailsJim Storey
General Inspection8/11/20088/11/20088/11/2008PPART
DetailsBob Reichert
looked ok
BMP Violation7/30/20088/6/20088/6/2008APASS
DetailsClint A Smith
All issues dealt with from the prior inspection.
CAS
General Inspection7/29/20087/30/20087/30/2008PFAIL
DetailsClint A Smith
Talked with RP over removing the asphalt berm on the east side of project. Due to the fact of blockng storm drain flow in the gutterpan. No colvert pipe was installed with it. Contsruct a proper construction entrance on the east end of the project where it shows on the plans. Protect the D. I. at the north east corner of project perimeter.
Will re-inspect on 8/6/08
CAS
460
Random Inspection7/29/20087/29/20087/29/2008PPASS
DetailsJim Storey
General Inspection7/25/20087/25/20087/25/2008PPASS
DetailsMike Kinnear
sign posted site looks fine
Random Inspection7/24/20087/24/20087/24/2008APASS
DetailsJim Storey
General Inspection7/23/20087/23/20087/23/2008APASS
DetailsMike Kinnear
sign posted, road enterance ok site looks fine
Random Inspection7/22/20087/22/20087/22/2008APASS
DetailsJim Storey
General Inspection7/1/20087/1/20087/1/2008APASS
DetailsClint A Smith
Site looks good. No issues present.
CAS
460
Site Preparation7/1/20087/1/20087/1/2008PDEFR
DetailsClint A Smith
Moved to a rondom Inspection.
CAS
460
Site Preparation6/26/20086/26/20086/26/2008APASS
DetailsClint A Smith
Site looks good. No issues present.
CAS
#460
Permit Ready to Issue  6/24/2008 DONE
Issue & PRINT permit COM  6/24/2008 DONE
Routing - Erosion and Sediment6/17/2008 6/17/2008 DONE
DetailsSteven Webb
ESC plan approved with attached conditions.
Routing - Erosion and Sediment6/10/2008 6/10/2008 FAIL
DetailsSteven Webb
ESC plan does not meet requirments according to BMC 8-17 or the NPDES CGP. Checklist faxed to PD.
Application received  5/28/2008