Random Inspection | 7/16/2009 | 7/16/2009 | 7/16/2009 | P | PASS |
Eric Strole
|
|
|
|
DOC - Permit Finaled | 7/16/2009 | 7/16/2009 | 7/16/2009 | P | PASS |
Eric Strole
|
|
|
|
Random Inspection | 8/11/2008 | 8/11/2008 | 8/11/2008 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 8/11/2008 | 8/11/2008 | 8/11/2008 | P | DEFR |
Clint A Smith
|
|
|
Moved to a random inspection. CAS
|
Site Preparation | 8/6/2008 | 8/7/2008 | 8/7/2008 | A | PASS |
Clint A Smith
|
|
|
All D.I.'s protected and sign posted. CAS
|
48 hr start notification | | | 8/6/2008 | | |
|
|
|
|
Issue & PRINT permit COM | | | 8/4/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/5/2008 | | 6/5/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/5/2008 | | |
|
|
|
Tisha.
|
Telephone call | | | 6/5/2008 | | DONE |
Tisha Gallop
|
|
|
called Mountain Eng. and spoke with Jeremy; told him permit is ready, fees paid and need RP to issue. He said permit is out to bid and when selected will have them come pick up.
|
Permit Ready to Issue | | | 6/5/2008 | | DONE |
|
|
|
|
Application received | | | 6/3/2008 | | |
|
|
|
|