General Inspection | 10/30/2008 | 10/30/2008 | 10/30/2008 | | DONE |
Clint A Smith
|
|
|
|
Site Final | 10/30/2008 | 10/30/2008 | 10/30/2008 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/29/2008 | 9/29/2008 | 9/29/2008 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/27/2008 | 8/27/2008 | 8/27/2008 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 7/25/2008 | 7/25/2008 | 7/25/2008 | A | PASS |
Pat Lass
|
|
|
looks ok
|
Site Preparation | 7/1/2008 | 7/1/2008 | 7/1/2008 | A | PASS |
Clint A Smith
|
|
|
Everthing looks good. No issues present.
|
Random Inspection | 6/26/2008 | 6/26/2008 | 6/26/2008 | P | PART |
Pat Lass
|
|
|
looks good everything in place
|
Issue & PRINT permit SFD | | | 6/19/2008 | | DONE |
|
|
|
|
Application received | | | 6/9/2008 | | |
|
|
|
|
Routing - Erosion and Sediment | 6/9/2008 | | 6/9/2008 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with attached conditions.
|