Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberESC08-00516
StatusFinaled
Name BLAKE BEYER
Site Address 6205 W FRANKLIN RD
Project NameSleeping Stone Spa
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final3/13/20093/13/20093/13/2009PPASS
DetailsTom Arcoraci
DOC - Permit Finaled3/13/20093/13/20093/13/2009PPASS
DetailsTom Arcoraci
General Inspection3/13/20093/13/20093/13/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection3/10/20093/10/20093/10/2009PPASS
DetailsTom Arcoraci
Site Preparation3/10/20093/10/20093/10/2009PCANC
DetailsTom Arcoraci
General Inspection3/6/20093/6/20093/6/2009PPASS
DetailsBob Reichert
looked ok
General Inspection3/3/20093/3/20093/3/2009PPASS
DetailsBob Reichert
looked ok
Tracking Control2/25/20092/25/20092/26/2009PPASS
DetailsClint A Smith
BMP Violation2/23/20092/23/20092/23/2009PPASS
DetailsDixie Fellows
HAT AT DI ALL CLEANED OUT AND DEBRIS CLEANED UP
Random Inspection2/23/20092/23/20092/23/2009AFAIL
DetailsDixie Fellows
hat at di full of frozen sand and covering opening. card board and other debris blowing around.
Random Inspection2/19/20092/19/20092/19/2009PPART
DetailsTom Arcoraci
told rp to sweep drive to stop track out
Tracking Control2/5/20092/6/20092/6/2009APASS
DetailsClint A Smith
11am
General Inspection2/2/20092/5/20092/5/2009AFAIL
DetailsClint A Smith
Correction Notice to RP via phone call:
1. Clean all hard surfaces of all sediment and debris.
2. Maintain storm drain inlet within the parking lot.
Complete by 2/6/09 or prior to any storm event. Will re-inspect on 2/6/09 11am. Failure to comply will result in a stop work order.
General Inspection ESC2/2/20092/2/20092/2/2009 FAIL
DetailsClint A Smith
Verbal Correction to RP:
Clean up all hard surfaces of all sediment and debris by 2/4/09 PM. Also maintain storm drain inlet within the parking lot. Will re-inspect on 2/5/09 AM
General Inspection ESC1/2/20091/2/20091/2/2009 FAIL
DetailsClint A Smith
Need to sweep up parking lot.
General Inspection11/25/200811/28/200811/28/2008PPASS
DetailsClint A Smith
General Inspection11/26/200811/26/200811/26/2008APASS
DetailsBob Reichert
looked ok
General Inspection11/25/200811/25/200811/25/2008APASS
DetailsBob Reichert
looked ok
Random Inspection11/25/200811/25/200811/25/2008PPART
DetailsClint A Smith
Sediment in the parking lot. Needs to be clean up by Friday 11/28/08. Will re-inspect on 11/28/08 in the PM.
Random Inspection11/14/200811/14/200811/14/2008PPART
DetailsTom Arcoraci
Tracking Control11/10/200811/11/200811/12/2008PPASS
DetailsClint A Smith
BMP Violation11/7/200811/10/200811/10/2008AFAIL
DetailsClint A Smith
Left a message with the RP.
Correction Notice:
Clean up all sediment and debris from all hard surfaces.
Failure to comply with the notice will result in a stop work order. Will re-inspect on 11/11/08 PM
BMP Violation11/6/200811/7/200811/7/2008AFAIL
DetailsClint A Smith
Spoke with RP to have all sediemnt and debris cleaned up by the end of the day today. Will re-inspect on 11/10/08 AM. Gutter pan was swept but parkinglot still needs to be cleaned.
Random Inspection11/6/200811/6/200811/6/2008PPART
DetailsSteven Webb
Verbal to RP: Some work had been completed since Inspector 408 had been on site earlier today but much grit & sediment remains against curb with a drop inlet on the downhill side. Since rain is likely, remove all and properly dispose by the end of the day.
Random Inspection11/6/200811/6/200811/6/2008PFAIL
DetailsTom Arcoraci
told rp to clean up sediment to prevent track out by end of day
General Inspection10/7/200810/7/200810/7/2008AFAIL
DetailsClint A Smith
Told RP to fix the silt fence and clean up any sediment off of the parking lot by the end of the week.
Tracking Control10/3/200810/3/200810/3/2008PPASS
DetailsClint A Smith
BMP Violation10/2/200810/3/200810/3/2008APART
DetailsClint A Smith
Giving the RP till the end of the day or prior to the storm event.
1. Clean up all sediment and debris out of parking lot.
2. Maintain silt fence at the west end of lot where it is to the back of the stock pile.
Will re-inspect at 4pm.
BMP Violation9/30/200810/2/200810/2/2008ACANC
DetailsClint A Smith
Moved to 10/3/08
BMP Violation10/1/200810/1/200810/1/2008APART
DetailsMike Jordan
Still needs to sweep portions of parkinglot and gutter pan. Contractor noted that excavator will be here tomorrow to backfill and will have remainder of parkinglot cleaned. All other issues have been resolved.
BMP Violation9/26/20089/30/20089/30/2008APART
DetailsClint A Smith
Need to add more stake to the wattle. Clean parking lot of all sediment and debris or a stop work order will be issued. Will re-inspect on 10/02/08
Conference9/29/20089/29/20089/29/2008ADONE
DetailsClint A Smith
Went over the correction notice with the RP and added in a concrete washout to be install prior to next pour date.
BMP Violation9/26/20089/26/20089/26/2008AFAIL
DetailsClint A Smith
Correction Notice.
1.Install BMP's to protect the stock pile along Franklin Rd.
2.Protect drain inlet within the parking lot.
3. Remove ALL sediment and debris of of ALL hardsurfaces.
Failure to comply will result in a Stop Work Order. Could not contact the RP. Will re-inspect on 9/30/08.

BMP Violation8/26/20088/28/20088/27/2008APASS
DetailsClint A Smith
all issues have been corrected.
General Inspection8/26/20088/26/20088/26/2008 FAIL
DetailsClint A Smith
Spoke with the RP over the pertaining issues.
1. Maint and Re-install silt fence where needed.
2. Provide a proper concrete washout pit with a plastic liner.
Will re-inspect on 8/28/08
CAS
General Inspection7/16/20087/23/20087/23/2008APASS
DetailsClint A Smith
Canal is protected with a silt fence.
CAS
Site Preparation7/16/20087/17/20087/16/2008APART
DetailsClint A Smith
Spoke with RP over the overall project and gave him a heads up that some type of sediment barrier is needed to procect the canal. They will be installing silt fence as there bmp to protect the canal. Will be removing the trash pile through out the week while demo is being done on the basement.
will re-inspect on 7/23/08
CAS
Issue & PRINT permit COM  7/15/2008 DONE
Routing - Erosion and Sediment6/18/2008 6/18/2008 PASS
DetailsClint A Smith
ESC plan approved with attached conditions.
Application received  6/10/2008