Site Final | 10/6/2008 | 10/6/2008 | 10/6/2008 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/30/2008 | 9/30/2008 | 9/30/2008 | A | DONE |
Clint A Smith
|
|
|
Correction Notice 1. Stabilize all disturbed soil prior to the issuing the C. of O.
|
Random Inspection | 9/29/2008 | 9/29/2008 | 9/29/2008 | A | PASS |
Jim Storey
|
|
|
|
General Inspection | 9/26/2008 | 9/26/2008 | 9/26/2008 | A | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
Site Preparation | 9/15/2008 | 9/22/2008 | 9/22/2008 | A | PART |
Clint A Smith
|
|
|
Need to protect storm drain at the back of the building. Spoke with the RP over the issue.
|
Random Inspection | 9/15/2008 | 9/15/2008 | 9/15/2008 | P | PASS |
James Rogers
|
|
|
|
Random Inspection | 8/28/2008 | 8/28/2008 | 8/28/2008 | A | PASS |
Jim Storey
|
|
|
|
General Inspection | 8/1/2008 | 8/1/2008 | 8/1/2008 | P | PASS |
Mike Kinnear
|
|
|
sign posted dumpster on site looks fine
|
Site Preparation | 7/30/2008 | 7/30/2008 | 7/30/2008 | P | PART |
Steven Webb
|
|
|
Need to containerize waste or remove everyday. Cannot leave on ground. Contractor moved and secured port-a-pot.
|
Site Preparation | 7/30/2008 | 7/30/2008 | 7/30/2008 | P | CANC |
Steven Webb
|
|
|
duplication of inspection
|
Site Preparation | 7/25/2008 | 7/25/2008 | 7/25/2008 | P | PART |
Steven Webb
|
|
|
verbal to rp that the yellow sign needs to be posted.
|
Issue & PRINT permit COM | | | 7/23/2008 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Erosion and Sediment | 7/21/2008 | | 7/21/2008 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions.
|
Fee-Waived (adds fee) | | | 7/21/2008 | | |
|
|
|
|
Application received | | | 6/13/2008 | | |
|
|
|
|