General Inspection | 3/30/2010 | 3/30/2010 | 3/31/2010 | | DONE |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 3/31/2010 | 3/31/2010 | 3/31/2010 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/28/2008 | 7/28/2008 | 7/28/2008 | A | PASS |
Clint A Smith
|
|
|
Site looks alright. No issues present. CAS
|
Site Preparation | 7/1/2008 | 7/2/2008 | 7/2/2008 | A | DEFR |
Clint A Smith
|
|
|
Moved to a random inspection. CAS 460
|
Random Inspection | 7/2/2008 | 7/2/2008 | 7/2/2008 | P | PASS |
Clint A Smith
|
|
|
Site looks alright. No issues present. CAS 460
|
General Inspection | 6/30/2008 | 6/30/2008 | 6/30/2008 | P | PASS |
Clint A Smith
|
|
|
Permit has been issued and ESC sign at job. STOP WORK ORDER has been pulled. CAS #460
|
Routing - Erosion and Sediment | 6/25/2008 | | 6/26/2008 | | PASS |
Clint A Smith
|
|
|
ESC waiver letter approved with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2008 | | |
|
|
|
BARBARA
|
Permit Ready to Issue | | | 6/26/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/26/2008 | | DONE |
Barbara Stitt
|
|
|
Called David Ross and told him that permit and waiver are approved and fees due///6-26-08 @ 8:15am BAS
|
Issue & PRINT permit COM | | | 6/26/2008 | | DONE |
|
|
|
|
Application received | | | 6/25/2008 | | DONE |
Barbara Stitt
|
|
|
|