Site Final | 7/8/2009 | 7/8/2009 | 7/8/2009 | A | PASS |
Doug A Poedy
|
|
|
Site looks good. whole house is finaled.
|
General Inspection | 2/19/2009 | 2/19/2009 | 2/19/2009 | P | PASS |
Jack Frank
|
|
|
ok
|
Random Inspection | 11/3/2008 | 11/3/2008 | 11/4/2008 | P | PASS |
Tony Young
|
|
|
|
Random Inspection | 10/22/2008 | 10/22/2008 | 10/22/2008 | A | PASS |
Mike Jordan
|
|
|
|
General Inspection | 10/20/2008 | 10/20/2008 | 10/20/2008 | P | PASS |
Pat Lass
|
|
|
ok
|
General Inspection | 10/17/2008 | 10/17/2008 | 10/17/2008 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 10/15/2008 | 10/15/2008 | 10/15/2008 | A | PASS |
Bob Reichert
|
|
|
looked ok
|
Site Preparation | 9/16/2008 | 9/23/2008 | 9/23/2008 | A | PASS |
Clint A Smith
|
|
|
Sign posted and the grade is under 2% so no perimeter bmp's are needed at this time.
|
Random Inspection | 9/15/2008 | 9/15/2008 | 9/16/2008 | P | PASS |
James Rogers
|
|
|
|
General Inspection | 7/21/2008 | 7/21/2008 | 7/21/2008 | P | PASS |
Tony Young
|
|
|
all ok
|
Issue & PRINT permit SFD | | | 7/3/2008 | | DONE |
|
|
|
|
Application received | | | 7/2/2008 | | |
|
|
|
|