Site Final | 9/26/2008 | 9/26/2008 | 9/26/2008 | A | PASS |
Pat Lass
|
|
|
landscaping done
|
General Inspection | 9/11/2008 | 9/11/2008 | 9/11/2008 | A | PASS |
Pat Lass
|
|
|
ok
|
General Inspection | 8/26/2008 | 8/26/2008 | 8/26/2008 | P | PASS |
Pat Lass
|
|
|
|
Random Inspection | 7/25/2008 | 7/25/2008 | 7/25/2008 | A | PART |
Pat Lass
|
|
|
talked to RP and he said he would clean up and set barriers today
|
Site Preparation | 7/14/2008 | 7/21/2008 | 7/21/2008 | A | PASS |
Clint A Smith
|
|
|
Work is all in the back area. Not bad. CAS
|
Site Preparation | 7/11/2008 | 7/14/2008 | 7/14/2008 | A | NR |
Clint A Smith
|
|
|
Worh has not started on the pool yet. Will re-inspect a week from now. CAS
|
Issue & PRINT permit SFD | | | 7/9/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/8/2008 | | 7/8/2008 | | PASS |
Clint A Smith
|
|
|
ESC plan waiver approved with attached conditions.
|
Application received | | | 7/7/2008 | | |
|
|
|
|