General Inspection | 10/1/2008 | 10/1/2008 | 10/1/2008 | | DONE |
Clint A Smith
|
|
|
Moved to a site final.
|
Site Final | 10/1/2008 | 10/1/2008 | 10/1/2008 | A | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 7/28/2008 | 7/31/2008 | 8/1/2008 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 7/25/2008 | 7/28/2008 | 7/28/2008 | P | PART |
Clint A Smith
|
|
|
Need to clean up sediment above where the pervious concrete was installed. CAS
|
Issue & PRINT permit COM | | | 7/21/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/9/2008 | | 7/9/2008 | | PASS |
Clint A Smith
|
|
|
ESC plan waiver approved with attached conditions.
|
Application received | | | 7/7/2008 | | |
|
|
|
|