DOC - Permit Finaled | 10/22/2009 | 10/22/2009 | 10/22/2009 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 2/18/2009 | 2/18/2009 | 2/18/2009 | A | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 2/13/2009 | 2/13/2009 | 2/13/2009 | P | PASS |
Pat Lass
|
|
|
looks good
|
General Inspection | 1/22/2009 | 1/22/2009 | 1/22/2009 | A | PASS |
Pat Lass
|
|
|
looks good
|
Random Inspection | 12/15/2008 | 12/15/2008 | 12/15/2008 | P | PASS |
Tony Young
|
|
|
|
Random Inspection | 11/19/2008 | 11/19/2008 | 11/19/2008 | P | PASS |
Daryl Spivey
|
|
|
concrete pit installed on site.............ds
|
Site Preparation | 11/13/2008 | 11/13/2008 | 11/13/2008 | | FAIL |
Clint A Smith
|
|
|
Left a message with the RP to provide a concrete washout pit with a sign posted where it is located.
|
Issue & PRINT permit COM | | | 11/6/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/17/2008 | | 7/17/2008 | | FAIL |
Steven Webb
|
|
|
No ESC application included with submittals, informed applicant
|
Routing - Erosion and Sediment | 7/17/2008 | | 7/17/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 7/9/2008 | | |
|
|
|
|