Site Final | 12/24/2008 | 12/24/2008 | 12/24/2008 | P | PASS |
Jim Sly
|
|
|
|
Site Final | 12/24/2008 | 12/24/2008 | 12/24/2008 | P | PASS |
Jim Sly
|
|
|
|
Site Final | 12/16/2008 | 12/17/2008 | 12/17/2008 | A | CANC |
Jim Sly
|
|
|
John S......Will Complete When Bldg final called in.
|
Site Final | 11/26/2008 | 11/26/2008 | 11/26/2008 | P | CANC |
Jim Sly
|
|
|
John Sawyer
|
Site Final | 11/18/2008 | 11/18/2008 | 11/18/2008 | P | NR |
Jim Sly
|
|
|
NR
|
BMP Violation | 8/15/2008 | 8/19/2008 | 8/19/2008 | A | PART |
Clint A Smith
|
|
|
Need to clean up just a little bit more.
|
Site Final | 8/15/2008 | 8/19/2008 | 8/18/2008 | A | CANC |
Clint A Smith
|
|
|
|
BMP Violation | 8/14/2008 | 8/15/2008 | 8/15/2008 | P | DEFR |
Clint A Smith
|
|
|
Moved till 8/19/08.
|
Site Preparation | 8/15/2008 | 8/15/2008 | 8/15/2008 | P | FAIL |
Jim Sly
|
|
|
Talked to john Sawyer (RP) Need to sweep street and clean Gutters.
|
Random Inspection | 8/14/2008 | 8/14/2008 | 8/14/2008 | P | CANC |
Clint A Smith
|
|
|
Duplicate
|
Complaint Inspection | 8/14/2008 | 8/14/2008 | 8/14/2008 | A | FAIL |
Clint A Smith
|
|
|
1.Need to protect D.I at the end of the street. 2.Clean up all sediment off of hard surfaces. Will re-inspect on 8/15/08 in the PM. CAS
|
Site Preparation | 8/14/2008 | 8/14/2008 | 8/14/2008 | A | PART |
Jack Frank
|
|
|
called Clint to have him inspect site because of violations
|
Application received | | | 7/11/2008 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 7/11/2008 | | DONE |
|
|
|
|