Permit Information
Permit NumberESC08-00698
StatusFinaled
Name DENNIS MCCOY
Site Address 3874 3876 N PATRICIA LN
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/11/20096/12/20096/12/2009APASS
DetailsJim Sly
Landscape completed... BMPs removed...soil stabilized.
Site Final6/12/20096/12/20096/12/2009PPASS
DetailsJim Sly
Site Final6/10/20096/11/20096/11/2009ACANC
DetailsJim Sly
Re-sched...
Site Final5/29/20096/10/20096/11/2009PCANC
DetailsJim Sly
Dennis Phone ....follow up. Re-sched....
Site Final5/29/20095/29/20095/29/2009PNR
DetailsJim Sly
Dennis phone.....Still pouring concrete.....
Site Final5/28/20095/28/20095/28/2009PNR
DetailsJim Sly
Dennis ###-####
Site Final5/28/20095/28/20095/28/2009ACANC
DetailsJim Sly
Random Inspection5/20/20095/20/20095/20/2009PPASS
DetailsJim Johnson
BMP Violation4/23/20094/27/20094/27/2009APASS
DetailsEric Strole
Random Inspection4/23/20094/23/20094/23/2009PFAIL
DetailsEric Strole
left verbal correction with rp to clean all concrete spoils, dirt & debris off all hard surfaces & post esc sign by 4-24-09. will reinspect 4-27-09 am.
General Inspection1/12/20091/12/20091/12/2009PPASS
DetailsPat Lass
called and reminded RP to clean street
General Inspection1/7/20091/7/20091/7/2009PPASS
DetailsJack Frank
ok snow covered
Random Inspection11/24/200811/24/200811/24/2008PCANC
DetailsEric Strole
LOOOOOOOOOKS GOOD
General Inspection10/20/200810/22/200810/22/2008PPART
DetailsEric Strole
waiting for underground electrical inspection, will have stock pile used for backfill at this time. rp said should be complete by weeks end.
General Inspection10/20/200810/20/200810/20/2008APART
DetailsEric Strole
left verbal correction with rp that if not going to have water & sewer backfilled by 10-22-08 that stockpile will have to be stablized from street.
General Inspection9/23/20089/30/20089/30/2008ADONE
DetailsClint A Smith
Stock pile will be back filled into the footing tomorrow. Will re-inspect at the end of the day on 10/1/08
General Inspection9/22/20089/23/20089/23/2008ADONE
DetailsClint A Smith
Spoke with the RP to clean up all concrete spoil pile off of the site and place them into a pit or off site. Also will re-inspect on 9/30/08 to make sure that the stock pile was removed at the front of the project area.
Site Preparation9/10/20089/10/20089/10/2008PFAIL
DetailsJim Sly
Dennis McCoy Called Dennis......Need Conc washout pit and need excavated material off site or < 6 percent grade.
Issue & PRINT permit SFD  9/4/2008 DONE
Application received  8/19/2008