Site Final | 3/25/2009 | 3/25/2009 | 3/25/2009 | A | PASS |
Eric Strole
|
|
|
|
General Inspection | 1/6/2009 | 1/6/2009 | 1/6/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok, too much snow
|
General Inspection | 12/18/2008 | 12/18/2008 | 12/18/2008 | P | PASS |
Eric Strole
|
|
|
|
DOC - Permit Finaled | 12/18/2008 | 12/18/2008 | 12/18/2008 | P | CANC |
Eric Strole
|
|
|
|
Random Inspection | 11/4/2008 | 11/4/2008 | 11/4/2008 | P | PASS |
Eric Strole
|
|
|
|
Site Preparation | 10/14/2008 | 10/14/2008 | 10/14/2008 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/13/2008 | 10/13/2008 | 10/13/2008 | P | PASS |
Jack Frank
|
|
|
site ok
|
Issue & PRINT permit COM | | | 10/7/2008 | | |
|
|
|
|
Routing - Erosion and Sediment | 8/22/2008 | | 8/22/2008 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 8/21/2008 | | |
|
|
|
|