Permit Information
Permit NumberESC08-00706
StatusFinaled
Name JAMES LARKIN
Site Address 550 S MAPLE GROVE RD
Project NamePINETREE VILLAGE SUB
Customer Number 
ePlanReview 
Description
For site development, does not include construction of structures.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection ESC7/21/20107/21/20107/21/2010 DONE
DetailsClint A Smith
All project area is stbilized
DOC - Permit Finaled7/21/20107/21/20107/21/2010PPASS
DetailsClint A Smith
General Inspection ESC7/21/20107/21/20107/21/2010 CANC
DetailsSteven Webb
duplication
General Inspection ESC7/6/20107/6/20107/6/2010 PASS
DetailsMike Jordan
Site found to be in general compliance.
General Inspection ESC6/21/20106/21/20106/22/2010 PASS
DetailsMike Jordan
General Inspection ESC6/4/20106/4/20106/4/2010 PASS
DetailsClint A Smith
General Inspection ESC5/20/20105/20/20105/20/2010 PART
DetailsClint A Smith
Still picking up all trash debris off site.
BMP Violation5/3/20105/4/20105/4/2010PPART
DetailsClint A Smith
Left message to RP thatr notice will not be pulled until all issues on the notice have been corrected. Inspector 450 will follow up.
General Inspection5/3/20105/3/20105/3/2010PFAIL
DetailsSteven Webb
Large quantity of trash and construction debris unmanaged. Material storage does not have a much needed construction entrance for reducing tracking. Vertical area of sub-division has double drop inlet protection but street sweeping on a daily basis is expected. Inspectorw 460 and 450 are meeting with the RP to present the correction notice. Compliance is expected to continue throughout the project. or additiona enforcement measures will occur.
BMP Violation5/3/20105/3/20105/3/2010AFAIL
DetailsClint A Smith
Correction Notice:
1. Remove or place all trash debris into waste containers. Through out the vertical construction.
2. Clean all hard surfaces of all sediemnt and debris. Through out the vertical construction.
3.Install sediment barriers at the south end of Pine st. & Pine Tree st. in the vertical construction area.
4. Maintian Storm Drain Inlets. Also remove the protection in the areas where all construction and developemnt is completed.

Failure to comply will result in further enforcement. Will re-inspect on 5/4/10PM.
General Inspection ESC4/20/20104/20/20104/20/2010 PASS
DetailsClint A Smith
Tracking Control4/2/20104/5/20104/5/2010APASS
DetailsClint A Smith
BMP Violation4/1/20104/2/20104/2/2010PFAIL
DetailsClint A Smith
Correction Notice verbally to RP:
Clean up all hard surface of all sediment and debris. Failure to comply will result in further enforcement. Will re-inspect on 4/5/10AM.
Conference3/31/20103/31/20104/1/2010PFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all sediment debris off of the hard surface where vertical construction is occuring to the maximum extent practible.
Also install a sediment barrier along the West end of the irragation channel. Will re-inspect on 3/2/10PM.
General Inspection ESC3/31/20103/31/20103/31/2010 FAIL
DetailsClint A Smith
Verbal to RP:
Clean up tracking at the east end of project area. Maintain storm drains. Will be having a confrence in the PM today.
Random Inspection10/21/200910/21/200910/21/2009PPASS
DetailsClint A Smith
General Inspection7/16/20097/16/20097/16/2009PPART
DetailsClint A Smith
Verbal to RP:
Clean up concrete residual infront of the concrete washout pit.
Random Inspection5/19/20095/19/20095/19/2009PPASS
DetailsMike Jordan
Random Inspection5/15/20095/15/20095/15/2009APASS
DetailsClint A Smith
Random Inspection5/5/20095/7/20095/7/2009APART
DetailsClint A Smith
Need to clean all sediment collected in the gutterpan. Street sweeper on schedule.
General Inspection5/5/20095/5/20095/5/2009PFAIL
DetailsClint A Smith
Verbal to RP:
clean up all sediment out of the gutter pan at the area of project where final landscaping has been achieved. Will re-inspect on 5/7/09AM
Random Inspection4/28/20094/28/20094/28/2009PPART
DetailsMike Jordan
Noted that pumps on Eveningstar have been removed. gave RP verbal c/n to remove boards from di, leave diprotection so that di are active. Rp will need to elevate the housekeeping in this area now that di are active. Will reinspect on friday 5-1.
Tracking Control4/14/20094/14/20094/14/2009PPASS
DetailsClint A Smith
4:30pm.
BMP Violation4/13/20094/14/20094/14/2009AFAIL
DetailsClint A Smith
Due to the dry conditions, the RP has been given until 4:00pm or prior to any storm event to have all of Shoup and the hardsurfaces of the south side of project cleaned up of all sediment and debris. Will re-inspect on 4:30pm today.
BMP Violation4/13/20094/13/20094/13/2009AFAIL
DetailsClint A Smith
Correction Notice to RP:
1.Clean up all hard surface of all sediment and debris, (where the plan amendment is not alocated for).
2. Clean up all trash debris through out project area.
3. Install new sediment barriersat the south west access area where the barrier has been ripped and falling apart.
Will re-inspect 4/14/09 10am.
General Inspection4/10/20094/10/20094/10/2009PFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all hard surfaces of all sediment and debris by 04/12/09PM. Will re-inspect on 04/13/09AM.
BMP Violation4/7/20094/8/20094/8/2009PPART
DetailsClint A Smith
Due to the Canal company not wanting the canal stabilized the GC will not be stabilizing the canal. We recommended to stabilize prior to the canal being active, due to the disturbing of the canal with the construction developement of the site.
Random Inspection3/25/20093/25/20093/25/2009PPASS
DetailsClint A Smith
BMP Violation3/17/20093/20/20093/20/2009PPASS
DetailsClint A Smith
General Inspection3/17/20093/17/20093/17/2009PFAIL
DetailsClint A Smith
Verbal to RP:
1. Clean up irragation canal of all debris.
2. Maintain silt fence along the canal.
3. Prior to canal being opened figure out how to stabilize the canal where disturbed soil has not been stabilized yet. (Canal is still inactive).
Will re-inspect on 3/20/09.
Tracking Control3/4/20093/4/20093/4/2009APART
DetailsClint A Smith
Majority of the ssediment has been cleaned up. Also external protection has been installed on streets and storms drain.
Tracking Control3/3/20093/3/20093/3/2009PFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all sediment and debris within project where the ammendment to the project does not cover. Must complete by the end of the day or prior to any storm event.
General Inspection2/27/20092/27/20092/27/2009PPART
DetailsClint A Smith
sprayed a hydo seed on the overpass side off of Maple Grove. Also cleaning up trash debris through out the project area.
Tracking Control2/23/20092/23/20092/23/2009APASS
DetailsClint A Smith
All sediment of street contained to the streets of the project where they have amended there plan to keep it. No tracking onto Shoup St.
BMP Violation2/19/20092/20/20092/20/2009PPASS
DetailsClint A Smith
BMP Violation2/19/20092/19/20092/19/2009PFAIL
DetailsClint A Smith
Verbal correction to RP:
Clean all hard surface of all sediment and debris. Both active side and un developed side.
Protect storm drains on the south side of project.
Clean up and containerize all trash debris on project area. Will re-inspect 2/20/09 PM.
Tracking Control2/5/20092/6/20092/6/2009APART
DetailsClint A Smith
wILL BE STREET SWEEPING ON ALL STREET AT THE END OF THE DAY.
Conference2/6/20092/6/20092/6/2009ADONE
DetailsSteven Webb
Met with RP, J. Larkin, Discussed plan modification. Making MS4 system "inactive" on internal street based on conditions. Conditions includes 1) fabric and plywood attached to drop inlets, 2) daily scraping and sweeping of streets, 3) plan to remove water if pooling of water exist into control basins 4) monitor and address construction exit to achieve MEP on track out onto ACHD streets. Any questions to be addressed to S. Webb at Boise City
Tracking Control2/5/20092/5/20092/5/2009PFAIL
DetailsClint A Smith
Verbal Correction to RP:
CLean up all hard surfaces of all sediment and debris by the end of the day or prior to any storm event. Will re-inspect on 2/6/09. AM
BMP Violation1/27/20091/29/20091/29/2009APART
DetailsClint A Smith
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Will input if pertaining to a single lot though.
BMP Violation1/27/20091/27/20091/27/2009PFAIL
DetailsClint A Smith
Left the message of the C/N with the RP
Correction Notice:
1.Clean all hard surfaces of all sediment and debris.
2. Install temporary protection on stockpile that will pervent erosion from occuring.
3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
Tracking Control1/21/20091/23/20091/23/2009PPART
DetailsClint A Smith
Need to keep up on sweeping if and sediment imgrates within the street and or gutterpan of the project.
Tracking Control1/16/20091/21/20091/21/2009PFAIL
DetailsClint A Smith
Correction Notice to RP:
Clean up all tracking (sediment and debris) through out project area on all hard surfaces. Failure to comply by 1/23/09 PM will result in a stop work order. Will re-inspect on 1/23/09 4:45pm .
Tracking Control1/16/20091/16/20091/16/2009AFAIL
DetailsClint A Smith
Verbal correction to RP:
Clean up all sediment (tracking) off of street area by 1/21/09 AM. Will re-inspect on 1/21/09 PM.
General Inspection12/28/200812/29/200812/29/2008ADONE
DetailsClint A Smith
Went over run off issues with RP and how to pervent direct dischages to the storm drain system.
General Inspection12/19/200812/19/200812/19/2008PPART
DetailsClint A Smith
Need to protect 2 storm drain inlets where they have finished constructing them within the interior of the project.
General Inspection12/10/200812/12/200812/12/2008PFAIL
DetailsClint A Smith
Tracking has occured on the west of project out into the subdivision. Also heavy sediment and debris out in the gutterpan of main drag through project. Told the RP to have cleaned up by the end of the day.
Site Preparation12/10/200812/10/200812/10/2008AFAIL
DetailsClint A Smith
Told the Gen Contractor to have all storm drain that are complete and active protected by 12/12/08. Also to clean up all overflow concrete from the sidewalk pours.
Random Inspection11/26/200811/26/200811/26/2008APASS
DetailsClint A Smith
Tracking Control11/20/200811/20/200811/20/2008PPASS
DetailsClint A Smith
2:00PM
Tracking Control11/20/200811/20/200811/20/2008AFAIL
DetailsClint A Smith
Left a message with RP.
Clean up tracking along Maple Grove. Also need to close off access point so no further tracking can be genarated. Will re-inspect today in the PM.
Site Preparation11/17/200811/17/200811/17/2008PPART
DetailsClint A Smith
Minor tracking out of project area. RP has a sweeper scheduled.
General Inspection10/28/200810/28/200810/28/2008PPASS
DetailsClint A Smith
No pertaining issues.
General Inspection10/16/200810/16/200810/16/2008APASS
DetailsClint A Smith
Irragation canal that ran through the project area is now piped in. No concerns over the pertaining issue. Site is still in utility phase. Everything is kept contained into project area.
Random Inspection10/8/200810/8/200810/8/2008APASS
DetailsClint A Smith
General Inspection10/3/200810/3/200810/3/2008PPASS
DetailsClint A Smith
Issues with the irragation ditch have been corrected and access control have been install also.
BMP Violation9/30/20089/30/20089/30/2008PFAIL
DetailsClint A Smith
Need to protect the irragation ditch at the South west end of project. Will re-inspect on 10/2/08
General Inspection9/30/20089/30/20089/30/2008PFAIL
DetailsSteven Webb
Small open canal running through active construction site. Area has been worked, bare soil on both sides of ditch. Instructed contractor/RP to provide protection until water is turned off and then piping can be performed. Ditch was running during inspection. Need to keep construction entrance maintained as wet season is approaching.
Conference9/26/20089/26/20089/26/2008PDONE
DetailsClint A Smith
Went over the potenail issues of tracking coming off of the project area. And recommend some perventitive measures that will eliminate any tracking issues.
General Inspection9/23/20089/23/20089/23/2008PFAIL
DetailsClint A Smith
Notice of Correction
1. Provide access control where needed on project area to deliniate the access into an approved construction entrance.
2. Maintain silt fence along the south side of the project area.
Left a message with the RP James Larkin
Will re-inspect on 9/26/08
Site Preparation9/8/20089/8/20089/8/2008PPASS
DetailsClint A Smith
Entrance installed and signage was placed at the entrance.
Site Preparation9/5/20089/5/20089/5/2008 PART
DetailsClint A Smith
Met with the RP and went over the issues of tracking control and dust. Need to use access control to deliniate what access to use. Also need to install an approved construction entance. No traffic can go on and off of the project til the time of the stabilized access is constructed.
CAS
Issue & PRINT permit COM  9/2/2008 DONE
DetailsTisha Gallop
Routing - Erosion and Sediment8/29/2008 8/29/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions.
PLANS/APPL TAKEN TO FRONT DESK  8/29/2008  
Telephone call  8/29/2008 DONE
Details
left vm for james larkin at ###-#### - permit ready and fees given
Permit Ready to Issue  8/29/2008 DONE
Details
Application received  8/22/2008  
Routing - Erosion and Sediment8/22/2008   PEND
DetailsSteven Webb