Site Final | 1/14/2009 | 4/14/2009 | 4/14/2009 | A | PASS |
Jim Sly
|
|
|
Previously passed...OK
|
Site Preparation | 3/24/2009 | 3/25/2009 | 3/25/2009 | A | PASS |
Jim Sly
|
|
|
OK
|
Site Final | 3/25/2009 | 3/25/2009 | 3/25/2009 | P | PASS |
Jim Sly
|
|
|
OK
|
Site Final | 3/24/2009 | 3/24/2009 | 3/24/2009 | P | CANC |
Jim Sly
|
|
|
Derick Re-Sched....
|
Site Final | 1/14/2009 | 1/14/2009 | 1/14/2009 | P | FAIL |
Jim Sly
|
|
|
Bldg final on Temp....until Erosion and Zoning finals..........Need to final erosion permit within 90 days of this notice.....notified RP.
|
Site Final | 1/13/2009 | 1/14/2009 | 1/14/2009 | A | NR |
Jim Sly
|
|
|
Derrick ###-#### fig-bccb Zoning and Bldg on Temp......90 days to complete and final erosion control permit
|
Site Final | 1/12/2009 | 1/13/2009 | 1/13/2009 | A | CANC |
Jim Sly
|
|
|
###-#### Re-sch...
|
Site Final | 1/12/2009 | 1/12/2009 | 1/12/2009 | P | CANC |
Jim Sly
|
|
|
|
Site Final | 12/31/2008 | 12/31/2008 | 12/31/2008 | P | CANC |
Jim Sly
|
|
|
Dereck Phone ###-####
|
General Inspection | 12/22/2008 | 12/22/2008 | 12/22/2008 | A | PASS |
Jack Frank
|
|
|
|
Random Inspection | 11/14/2008 | 11/14/2008 | 11/14/2008 | P | PASS |
Jim Sly
|
|
|
DERICK C
|
General Inspection | 11/6/2008 | 11/6/2008 | 11/6/2008 | A | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
Random Inspection | 11/5/2008 | 11/5/2008 | 11/5/2008 | P | PASS |
Jim Sly
|
|
|
|
Random Inspection | 10/22/2008 | 10/29/2008 | 10/29/2008 | A | PASS |
Clint A Smith
|
|
|
site kept clean. No issues present at this time.
|
Tracking Control | 10/15/2008 | 10/22/2008 | 10/22/2008 | A | PASS |
James Rogers
|
|
|
|
General Inspection | 10/21/2008 | 10/21/2008 | 10/21/2008 | A | PASS |
Bob Reichert
|
|
|
looked ok
|
Site Preparation | 10/16/2008 | 10/16/2008 | 10/16/2008 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 10/15/2008 | 10/15/2008 | 10/15/2008 | P | PART |
Jack Frank
|
|
|
site ok excavation work being done
|
Site Preparation | 10/15/2008 | 10/15/2008 | 10/15/2008 | A | PASS |
Jim Sly
|
|
|
|
Site Preparation | 10/15/2008 | 10/15/2008 | 10/15/2008 | | PASS |
Clint A Smith
|
|
|
Will not be installing a construction access due to the pour date being so soon. They are not allowing any access off of Ustick. Only when pour dates. WIll have any sedimenyt swept up when it occurs on the same day.
|
Site Preparation | 10/10/2008 | 10/15/2008 | 10/15/2008 | A | PASS |
James Rogers
|
|
|
|
Site Preparation | 10/10/2008 | 10/10/2008 | 10/10/2008 | P | PASS |
James Rogers
|
|
|
Site excavation in progress.
|
Issue & PRINT permit COM | | | 10/8/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/10/2008 | | 9/10/2008 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with attched conditions.
|
Application received | | | 9/3/2008 | | |
|
|
|
|