Site Final | 12/2/2009 | 12/4/2009 | 12/4/2009 | P | PASS |
Tony Young
|
|
|
|
DOC - Permit Finaled | 12/4/2009 | 12/4/2009 | 12/4/2009 | P | PASS |
Tony Young
|
|
|
|
General Inspection | 1/9/2009 | 1/9/2009 | 1/9/2009 | P | PASS |
Pat Lass
|
|
|
looks ok
|
General Inspection | 1/8/2009 | 1/8/2009 | 1/8/2009 | A | PASS |
Pat Lass
|
|
|
looks good
|
Random Inspection | 11/5/2008 | 11/5/2008 | 11/5/2008 | P | PASS |
Tony Young
|
|
|
|
General Inspection | 11/4/2008 | 11/4/2008 | 11/4/2008 | A | PASS |
Pat Lass
|
|
|
site clean sign posted and dirt contained
|
Random Inspection | 10/30/2008 | 10/30/2008 | 10/30/2008 | A | PASS |
Dixie Fellows
|
|
|
check job site while doing heating inspection---job site clean
|
Random Inspection | 10/21/2008 | 10/21/2008 | 10/21/2008 | A | PASS |
Dixie Fellows
|
|
|
site clean
|
Tracking Control | 9/29/2008 | 9/29/2008 | 9/29/2008 | P | PASS |
Tony Young
|
|
|
|
Site Preparation | 9/26/2008 | 9/26/2008 | 9/26/2008 | P | PASS |
Tony Young
|
|
|
|
Site Preparation | 9/9/2008 | 9/9/2008 | 9/9/2008 | | NR |
Clint A Smith
|
|
|
|
Application received | | | 9/8/2008 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 9/8/2008 | | DONE |
|
|
|
|