General Inspection | 12/16/2010 | 12/16/2010 | 12/16/2010 | | DONE |
Steven Webb
|
|
|
|
DOC - Permit Finaled | 12/16/2010 | 12/16/2010 | 12/16/2010 | P | PASS |
Steven Webb
|
|
|
|
Aging Inspection | 11/15/2010 | 11/15/2010 | 11/15/2010 | | FAIL |
Troy James
|
|
|
landscaping still has not been completed, BLD has been finaled, no sign posted
|
General Inspection | 5/24/2010 | 5/24/2010 | 5/24/2010 | | DONE |
Clint A Smith
|
|
|
|
General Inspection | 4/22/2010 | 4/22/2010 | 4/22/2010 | | NR |
Steven Webb
|
|
|
Site stabilization has not been completed.
|
Random Inspection | 3/19/2010 | 3/22/2010 | 3/22/2010 | P | PART |
Jim Storey
|
|
|
wip
|
Site Final | 3/12/2010 | 3/12/2010 | 3/12/2010 | P | NR |
Jim Storey
|
|
|
left open for home owner landscaping.
|
Random Inspection | 12/18/2009 | 12/18/2009 | 12/18/2009 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 12/9/2009 | 12/9/2009 | 12/9/2009 | A | PASS |
Jim Storey
|
|
|
|
General Inspection | 12/4/2009 | 12/4/2009 | 12/4/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 11/20/2009 | 11/20/2009 | 11/20/2009 | P | PASS |
Troy James
|
|
|
|
Random Inspection | 10/2/2009 | 10/2/2009 | 10/2/2009 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 10/1/2009 | 10/1/2009 | 10/1/2009 | A | PASS |
Jim Storey
|
|
|
|
General Inspection | 9/23/2009 | 9/23/2009 | 9/23/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok street side
|
Site Preparation | 9/9/2009 | 9/14/2009 | 9/14/2009 | A | PASS |
Eric Strole
|
|
|
Follow up inspection
|
Site Preparation | 9/11/2009 | 9/11/2009 | 9/11/2009 | A | PASS |
Jim Storey
|
|
|
|
General Inspection | 9/10/2009 | 9/10/2009 | 9/10/2009 | P | PASS |
Steven Webb
|
|
|
Sign is posted. Instructed concrete worker to washout residual into on site washout area.
|
Site Preparation | 9/9/2009 | 9/9/2009 | 9/9/2009 | A | PART |
Steven Webb
|
|
|
Contacted builder, (Nick, Southern Idaho Builders). Informed contractor to get the existing ESC Permit transfered into his name with a current certified RP. As well, post signage, install sediment barrier behind sidewalk for protection of stockpiled soils and use washout area for all concrete washout. Complete all activities by the end of the week, will re-inspect on Monday, Sept. 14th.
|
(F) Reprint permit | | | 9/9/2009 | | DONE |
|
|
|
|
Random Inspection | 9/8/2009 | 9/8/2009 | 9/8/2009 | A | PASS |
Jim Storey
|
|
|
|
General Inspection | 9/23/2008 | 9/23/2008 | 9/23/2008 | P | CANC |
Steven Webb
|
|
|
Duplicate inspection
|
General Inspection | 9/23/2008 | 9/23/2008 | 9/23/2008 | P | PASS |
Steven Webb
|
|
|
Demo completed, hydro-seed sprayed and sediment barrier installed.
|
Case Summary (ESC) | | | 9/19/2008 | | |
|
|
|
|
Random Inspection | 9/17/2008 | 9/17/2008 | 9/17/2008 | P | PART |
Mike Jordan
|
|
|
ESC permit sign posted. After tree removal, remainder of lot will need to be waddeled. Also noted to excavating contractor that some sort of soil stabelization will need to be done on lot.
|
BMP Violation | 9/12/2008 | 9/16/2008 | 9/16/2008 | A | PASS |
Clint A Smith
|
|
|
Need to clean up the driveway on a daily basis. Perimeter control are inplace.
|
Site Preparation | 9/12/2008 | 9/12/2008 | 9/12/2008 | | FAIL |
Clint A Smith
|
|
|
Notice of Correction. 1. Need to install sediment bmp's a the back of lot at the hillside. 2. Need to install sediment bmp's at the stockpile in the drive way to prevent sediment from traveling into the gutterpan and into the storm drains. Must comply by 9/15/08 or further enforcement will be taken. CAS Will re-inspect on 9/16/08
|
Application received | | | 9/11/2008 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 9/11/2008 | | DONE |
|
|
|
|