Permit Information
Permit NumberESC08-00789
StatusFinaled
Name BRIAN FLYNN
Site Address 6411 S BUSINESS WAY
Project NamePREMIER STORAGE CONDOS
Customer Number 
ePlanReview 
Description
BLDG B inside Phase I only.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection11/16/201011/16/201011/16/2010 DONE
DetailsTroy James
DOC - Permit Finaled11/16/201011/16/201011/16/2010PPASS
DetailsTroy James
General Inspection2/18/20102/18/20102/18/2010PPASS
DetailsBob Reichert
looked ok
General Inspection5/4/20095/4/20095/4/2009APASS
DetailsPat Lass
looks ok
Random Inspection4/22/20094/22/20094/22/2009PPART
DetailsBill VanDegrift
working in the concrete gutter along the road taking care of the tracking and sweeping as they go.
Random Inspection4/21/20094/21/20094/21/2009PPART
DetailsJim Storey
General Inspection4/9/20094/9/20094/9/2009PPASS
DetailsJack Frank
ok note parking lot work going on
Random Inspection4/6/20094/6/20094/6/2009PPASS
DetailsJim Storey
BMP Violation3/18/20093/20/20093/20/2009PPASS
DetailsClint A Smith
Random Inspection3/18/20093/18/20093/18/2009PPART
DetailsClint A Smith
Verbal to RP:
Still need to re-install a section of silt fence along the north east end of project area. Will re-inspect on 3/20/09 PM.
General Inspection3/13/20093/13/20093/13/2009APASS
DetailsMike Kinnear
sign posted site looks fine
Tracking Control3/11/20093/11/20093/11/2009APASS
DetailsEric Strole
all corrections are complete, stop work has been lifted. spoke with rp to let him know that he needs to stay on top of his site so to keep from having these issues again.
Site Preparation3/11/20093/11/20093/11/2009ACANC
DetailsEric Strole
Random Inspection3/11/20093/11/20093/11/2009ADONE
DetailsClint A Smith
Verified that violations have been correct except for 20ft of silt fence needs to be trenched in. Inspector #380 has left a message for the RP to contact him for a re-inspection of the project to have the Stop Work Order can be lifted. Per BMC 8-17 the responsible person must have day to day control over the project to asure compliance. The "Stop Work Order" will stay in place until the responsible person contacts the city for a re-inspection.
Random Inspection3/11/20093/11/20093/11/2009ADONE
DetailsClint A Smith
Verified that violations have been correct except for 20ft of silt fence needs to be trenched in. Inspector #380 has left a message for the RP to contact him for a re-inspection of the project to have the Stop Work Order can be lifted. Per BMC 8-17 the responsible person must have day to day control over the project to asure compliance. The "Stop Work Order" will stay in place until the responsible person contacts the city for a re-inspection.
Tracking Control3/10/20093/10/20093/10/2009PFAIL
DetailsEric Strole
stop work till all corrections on correction notice that was issued 3-9-09 & hydaulic fluid in street & on site are complete.
General Inspection3/9/20093/9/20093/9/2009PPASS
DetailsPat Lass
looks ok
Tracking Control3/8/20093/9/20093/9/2009PFAIL
DetailsEric Strole
left written & verbal correction on voice mail with rp to clean tracking ,gutter pans, trash,maintain construction entrance, maintain bmp's & put concrete in washout pit. have complete by 3-10-09 will reinspect 3-10-09 pm.
Tracking Control3/6/20093/6/20093/6/2009AFAIL
DetailsEric Strole
left verbal correction with rp to maintain di, construction entrance & clean tracking & gutter pans by days end.
Tracking Control2/24/20092/27/20092/27/2009APART
DetailsEric Strole
Spoke with rp, 3-2-09 they will be removing silt fence so they can prep & pour sidewalks. At the end of each day they will sweap dirt & debris back onto there site.
Random Inspection2/24/20092/24/20092/24/2009PPART
DetailsBill VanDegrift
called rp to sweep street
General Inspection2/17/20092/17/20092/17/2009APART
DetailsMike Kinnear
sign posted site looks
General Inspection2/5/20092/5/20092/5/2009APASS
DetailsMike Kinnear
sign posted site looks fine
Random Inspection2/3/20092/3/20092/3/2009APASS
DetailsClint A Smith
Random Inspection1/30/20091/30/20091/30/2009APASS
DetailsJim Storey
General Inspection1/29/20091/29/20091/29/2009APART
DetailsMike Kinnear
sign posted site looks good
Random Inspection1/27/20091/27/20091/27/2009APASS
DetailsBill VanDegrift
site looks good
General Inspection1/23/20091/23/20091/23/2009PDONE
DetailsBob Reichert
too much snow to see
General Inspection1/20/20091/23/20091/23/2009PPART
DetailsClint A Smith
Due to snow was not able to see the valley gutter.
General Inspection1/14/20091/20/20091/20/2009AFAIL
DetailsClint A Smith
Left message with RP:
1. Clean valley gutters of all sediment and debris.
2. Stay on top of all tracking off of the project area.
3. Maintain D.I.'s Will re-inspect on 1/23/09.
BMP Violation1/13/20091/14/20091/14/2009AFAIL
DetailsClint A Smith
Verbal to RP:
Met with RP over site and conditions. Told him to mantain the construction entrance when needed. Also to Maintain both storm drains at the north end of Business Way & Gowen Rd. Keep working on the valley gutter to relieve the muddy sediment as much as possible. If they choose to work in these saturated conditions they wil need to follow these step to stay compliant. Will re-inspect on 1/20/09 AM
BMP Violation1/12/20091/13/20091/14/2009PPART
DetailsClint A Smith
(discussed with RP via phone call)
Swept up street. Construction entrance was addressed. Silt fence needs to be installed per industry standards. Also valley gutter need to have all sediment and debris removed from it. Also maintain storm drain at the end of the valley gutter. Will re-inspect 1/14/08 at 10am.
Complaint Inspection1/12/20091/12/20091/12/2009PFAIL
DetailsClint A Smith
Corrction Notice: (Instructed RP via phone call)
1. Clean up all sediment and debris off of all hardsurfaces.
2. Maintain construction entrance at the south end of project area.
3. Install a sediment barrier along the east side of project to protect storm drain swale.
4. Install access barriers along the east and north east side of project area.
5. Install a second construction access at the north east end of project if being used for access or refer to correction 4.
Failure to comply will result in a Stop Work Order.
General Inspection12/9/200812/9/200812/9/2008APASS
DetailsMike Kinnear
sign posted site looks fine
Site Preparation11/27/200811/27/200811/28/2008 PASS
DetailsClint A Smith
Random Inspection11/24/200811/24/200811/24/2008PPASS
DetailsJim Storey
Random Inspection11/21/200811/21/200811/21/2008ACANC
DetailsJim Storey
Random Inspection11/21/200811/21/200811/21/2008APART
DetailsJim Storey
wash out for concrete being exavated.
Issue & PRINT permit COM  11/20/2008 DONE
Routing - Erosion and Sediment9/24/2008 9/24/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions.
Application received  9/15/2008