Site Final | 1/15/2010 | 1/15/2010 | 1/15/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 10/19/2009 | 10/19/2009 | 10/19/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 9/2/2009 | 9/2/2009 | 9/2/2009 | A | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 8/21/2009 | 8/21/2009 | 8/21/2009 | P | PASS |
Eric Strole
|
|
|
|
Random Inspection | 6/9/2009 | 6/9/2009 | 6/9/2009 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 5/15/2009 | 5/19/2009 | 5/19/2009 | A | PART |
Clint A Smith
|
|
|
Will provide a washout pit prior to anymore concrete work occuring.
|
BMP Violation | 5/13/2009 | 5/15/2009 | 5/15/2009 | A | FAIL |
Clint A Smith
|
|
|
Correction Notice: Provide a washout pit for any further clean out needed. Clean up all residuel for washing out on the front of lot. Update all info on the ESC sign due to the RP change. Failure to comply will result in a Stop Work Order. Will re-inspect 5/19/09AM
|
Random Inspection | 5/14/2009 | 5/14/2009 | 5/14/2009 | P | PART |
Tom Arcoraci
|
|
|
|
Routing - Erosion and Sediment | 5/14/2009 | | 5/14/2009 | | DONE |
Steven Webb
|
|
|
Contractor changed RP to David Kelley, CON07-00624
|
Random Inspection | 5/13/2009 | 5/13/2009 | 5/13/2009 | P | FAIL |
Steven Webb
|
|
|
Verbal correction to company: Contacted RP-Mark and he informed me that he is no longer with Vertical Con. Call and left voice mail to Vertical, needs valid certified RP, as well, need to have washout area for stucco and other non-stormwater residuals. Observed recent washout activities had occured without proper containment. Inspector 460 will follow up on 5/15/09.
|
Random Inspection | 5/11/2009 | 5/11/2009 | 5/11/2009 | P | PASS |
Bill VanDegrift
|
|
|
|
Random Inspection | 4/14/2009 | 4/14/2009 | 4/14/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 4/10/2009 | 4/10/2009 | 4/10/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 4/10/2009 | 4/10/2009 | 4/10/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Tracking Control | 2/3/2009 | 2/10/2009 | 2/10/2009 | A | PASS |
James Rogers
|
|
|
|
Tracking Control | 2/3/2009 | 2/3/2009 | 2/3/2009 | P | CANC |
James Rogers
|
|
|
Duplicate
|
Random Inspection | 1/27/2009 | 2/3/2009 | 2/3/2009 | A | PASS |
James Rogers
|
|
|
|
Random Inspection | 1/27/2009 | 1/27/2009 | 1/27/2009 | P | PASS |
James Rogers
|
|
|
|
Random Inspection | 1/14/2009 | 1/21/2009 | 1/22/2009 | A | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 1/22/2009 | 1/22/2009 | 1/22/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 1/21/2009 | 1/21/2009 | 1/21/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 1/14/2009 | 1/14/2009 | 1/14/2009 | P | PASS |
James Rogers
|
|
|
|
Random Inspection | 12/31/2008 | 1/7/2009 | 1/7/2009 | A | PASS |
James Rogers
|
|
|
|
Random Inspection | 12/31/2008 | 12/31/2008 | 12/31/2008 | P | PASS |
James Rogers
|
|
|
|
BMP Violation | 11/12/2008 | 11/12/2008 | 11/12/2008 | A | PASS |
James Rogers
|
|
|
Stop work order issued under permit ESC08-00744, demo should have been under this permit. Violations that were listed on 11-10-2008 under 00744 have been corrected.
|
Site Preparation | 11/10/2008 | 11/10/2008 | 11/10/2008 | P | FAIL |
Steven Webb
|
|
|
Inspector JLR placed STop Work Order. Improper concrete washout, excessive mud tracking off of site. I informed Dave K. from Vertical of the Stop Work. RP needs to control the site---day-to-day. No further work until inspector JLR has been notified and he re-inspects.
|
Site Preparation | 11/10/2008 | 11/10/2008 | 11/10/2008 | P | PASS |
Tom Arcoraci
|
|
|
track out protection in place
|
Site Preparation | 10/23/2008 | 10/23/2008 | 10/23/2008 | | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit SFD | | | 10/16/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Application received | | | 9/19/2008 | | |
|
|
|
|