Site Final | 5/10/2009 | 5/11/2009 | 5/11/2009 | A | PASS |
Jim Sly
|
|
|
Re-insp
|
Site Final | 5/11/2009 | 5/11/2009 | 5/11/2009 | P | PASS |
Jim Sly
|
|
|
Re-insp.....Pass
|
Site Final | 4/22/2009 | 5/8/2009 | 5/10/2009 | A | CANC |
Jim Sly
|
|
|
Re-Sched.......
|
Site Final | 4/22/2009 | 4/22/2009 | 4/22/2009 | P | PART |
Jim Sly
|
|
|
Complete sod and stabilize denuded soil.
|
Tracking Control | 4/8/2009 | 4/9/2009 | 4/9/2009 | P | PASS |
Eric Strole
|
|
|
|
General Inspection | 4/7/2009 | 4/8/2009 | 4/8/2009 | A | PART |
Eric Strole
|
|
|
left verbal correction with rp to clean dirt & debris off street & all hard surfaces & post esc sign. will reinspect 4-9-09
|
General Inspection | 3/9/2009 | 3/10/2009 | 3/10/2009 | A | PASS |
Eric Strole
|
|
|
|
General Inspection | 12/31/2008 | 12/31/2008 | 12/31/2008 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 12/16/2008 | 12/16/2008 | 12/16/2008 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 12/15/2008 | 12/15/2008 | 12/15/2008 | P | PASS |
Jim Sly
|
|
|
Brett P
|
Random Inspection | 12/11/2008 | 12/11/2008 | 12/11/2008 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 11/10/2008 | 11/10/2008 | 11/10/2008 | P | PASS |
Bob Reichert
|
|
|
called rp, left message to add esc items on list
|
Site Preparation | 11/10/2008 | 11/10/2008 | 11/10/2008 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 11/7/2008 | 11/7/2008 | 11/7/2008 | P | PART |
Eric Strole
|
|
|
left verbal correction with rp that by the next pour he needs to install a concrete washout pit.
|
Site Preparation | 11/4/2008 | 11/5/2008 | 11/5/2008 | A | PASS |
Jim Sly
|
|
|
Brett Plummer
|
Issue & PRINT permit SFD | | | 11/3/2008 | | DONE |
|
|
|
|
Application received | | | 10/7/2008 | | |
|
|
|
|