DOC - Permit Finaled | 10/21/2009 | 10/21/2009 | 10/21/2009 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 4/20/2009 | 4/20/2009 | 4/20/2009 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 4/17/2009 | 4/17/2009 | 4/17/2009 | A | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 4/16/2009 | 4/16/2009 | 4/16/2009 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 4/15/2009 | 4/15/2009 | 4/15/2009 | A | PART |
Jack Frank
|
|
|
needs to clean up trash # 360 already called r/p
|
Random Inspection | 4/14/2009 | 4/14/2009 | 4/14/2009 | P | PART |
Jim Johnson
|
|
|
gave R P verbal correction on trash clean-up
|
Random Inspection | 4/7/2009 | 4/7/2009 | 4/7/2009 | P | PASS |
Jim Johnson
|
|
|
|
Random Inspection | 4/2/2009 | 4/2/2009 | 4/2/2009 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 3/19/2009 | 3/19/2009 | 3/19/2009 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 3/16/2009 | 3/16/2009 | 3/16/2009 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 3/13/2009 | 3/13/2009 | 3/13/2009 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 3/10/2009 | 3/10/2009 | 3/10/2009 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 | A | PASS |
Mike Jordan
|
|
|
|
Tracking Control | 3/5/2009 | 3/5/2009 | 3/5/2009 | P | PASS |
Mike Jordan
|
|
|
|
Tracking Control | 3/4/2009 | 3/4/2009 | 3/4/2009 | P | PART |
Mike Jordan
|
|
|
Trackout has been cleaned up. contractor is sweeping as needed to keep trackout at a minimum.
|
Tracking Control | 3/3/2009 | 3/3/2009 | 3/3/2009 | P | FAIL |
Mike Jordan
|
|
|
Excessive trackout, rp has been notified and must be cleaned up by end of day.
|
Random Inspection | 3/2/2009 | 3/2/2009 | 3/2/2009 | P | PASS |
Mike Jordan
|
|
|
|
Tracking Control | 2/23/2009 | 2/23/2009 | 2/23/2009 | A | PASS |
Mike Jordan
|
|
|
|
Tracking Control | 2/20/2009 | 2/20/2009 | 2/20/2009 | P | PART |
Mike Jordan
|
|
|
Contractor is sweeping on daily and as needed basis. Trackout is minimal.
|
Tracking Control | 1/30/2009 | 1/30/2009 | 1/30/2009 | A | PART |
Mike Jordan
|
|
|
Contacted RP, to have him clean up sediment on street.
|
Tracking Control | 1/27/2009 | 1/28/2009 | 1/28/2009 | P | PART |
Clint A Smith
|
|
|
Verbal discussion with RP: Actively cleaning up during inspection. Was told the clean up will be completed by the end of the day.
|
Tracking Control | 1/27/2009 | 1/27/2009 | 1/27/2009 | P | FAIL |
Clint A Smith
|
|
|
Left message with RP. Correction Notice: 1. Clean up all sediment and debris off of all hard surfaces. Failure to comply will result in a stop work order. Will re-inspect on 1/28/09 PM
|
Site Preparation | 1/26/2009 | 1/26/2009 | 1/26/2009 | P | PASS |
Mike Jordan
|
|
|
|
Issue & PRINT permit SFD | | | 1/20/2009 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 10/14/2008 | | |
|
|
|
|