Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberESC08-00892
StatusFinaled
Name JAMES LARKIN
Site Address 560 S BLUE PINE LN
Project NamePinetree Village
Customer Number 
ePlanReview 
Description
Unit 2 Buiding 14
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled6/4/20096/4/20096/4/2009PPASS
DetailsClint A Smith
Random Inspection4/21/20094/21/20094/21/2009PPASS
DetailsMike Jordan
General Inspection4/6/20094/6/20094/6/2009PPART
DetailsSteven Webb
Verbal to rp; clean gutter pans, management of trash, spray stockpile on shoop st.
Random Inspection3/18/20093/18/20093/18/2009PPASS
DetailsMike Jordan
BMP Violation3/13/20093/13/20093/13/2009APASS
DetailsMike Jordan
General Inspection3/11/20093/11/20093/11/2009PPART
DetailsMike Jordan
Needs to pick up all const debries and sweep street, sidewalks and gutterpan. verbal c/n given to rp.
General Inspection3/9/20093/9/20093/9/2009PPASS
DetailsBob Reichert
looked ok
BMP Violation2/23/20092/23/20092/23/2009PPASS
DetailsMike Jordan
BMP Violation2/20/20092/20/20092/20/2009PPART
DetailsMike Jordan
Significant progress has been made on clean up. Needs to pickup all const. debries.
BMP Violation2/19/20092/19/20092/19/2009PFAIL
DetailsMike Jordan
Needs to sweep all sediments from sidewalk, street and gutterpans. Verbal c/n given to RP.
Tracking Control2/19/20092/19/20092/19/2009APASS
DetailsMike Jordan
Tracking Control2/18/20092/18/20092/18/2009PPART
DetailsMike Jordan
trackout is minimal, contractor is sweeping on a daily basis and as needed.
Tracking Control2/17/20092/17/20092/17/2009PPASS
DetailsMike Jordan
Random Inspection2/11/20092/11/20092/11/2009PPASS
DetailsMike Jordan
Random Inspection2/10/20092/10/20092/10/2009PPASS
DetailsMike Jordan
Random Inspection2/3/20092/3/20092/3/2009PPASS
DetailsJim Johnson
sign posted additional exteral protection on storm drain installedstockpiles have been removed
BMP Violation1/27/20091/29/20091/29/2009APART
DetailsClint A Smith
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Refer to ESC08-00706. Will input if pertaining to a single lot though.
BMP Violation1/27/20091/27/20091/27/2009PFAIL
DetailsClint A Smith
Left the message of the C/N with the RP
Correction Notice:
1.Clean all hard surfaces of all sediment and debris.
2. Install temporary protection on stockpile that will pervent erosion from occuring.
3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
Site Preparation1/22/20091/22/20091/22/2009PPASS
DetailsMike Jordan
ESC permit sign posted. ok.
Site Preparation1/21/20091/21/20091/21/2009APART
DetailsMike Jordan
All BMP's inplace. Gave RP verbal c/n to post ESC signs.
Issue & PRINT permit SFD  1/20/2009 DONE
DetailsBarbara Stitt
Application received  10/14/2008  
Routing - Erosion and Sediment     
DetailsSteven Webb