Site Final | 4/7/2009 | 4/7/2009 | 4/7/2009 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/19/2008 | 12/19/2008 | 12/19/2008 | A | PASS |
Jack Frank
|
|
|
site looks ok ground is snow covered
|
Random Inspection | 12/16/2008 | 12/16/2008 | 12/16/2008 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 12/1/2008 | 12/1/2008 | 12/1/2008 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 11/25/2008 | 11/26/2008 | 11/26/2008 | A | PASS |
Mike Jordan
|
|
|
ESC permit sign posted. All const. debries are contained. Site was clean.
|
General Inspection | 11/25/2008 | 11/25/2008 | 11/25/2008 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 11/25/2008 | 11/25/2008 | 11/25/2008 | A | CANC |
Mike Jordan
|
|
|
|
General Inspection | 11/24/2008 | 11/24/2008 | 11/24/2008 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 11/14/2008 | 11/17/2008 | 11/17/2008 | A | FAIL |
Clint A Smith
|
|
|
tracing has occured by drop off of lumber. Driver is cleaning it up. All other sediment and debris on the sidewalk and gutter pan needs to be cleaned up by 11/20/08 AM.
|
Site Preparation | 11/14/2008 | 11/14/2008 | 11/14/2008 | A | FAIL |
Clint A Smith
|
|
|
Need to clean of side walks from foot tracking and the gutterpan where there is concrete residule. Told RP to have it completed by 11/17/08 AM
|
BMP Violation | 11/13/2008 | 11/13/2008 | 11/13/2008 | P | PASS |
Mike Jordan
|
|
|
ESC permit sign posted.
|
BMP Violation | 11/13/2008 | 11/13/2008 | 11/13/2008 | A | CANC |
Mike Jordan
|
|
|
|
Site Preparation | 11/12/2008 | 11/12/2008 | 11/12/2008 | P | PART |
Mike Jordan
|
|
|
Needs to post ESC permit sign. BMP's in place as well as conc. washout area. Notified RP to post ESC sign via verbal c/n.
|
Issue & PRINT permit SFD | | | 11/5/2008 | | DONE |
|
|
|
|
Application received | | | 10/17/2008 | | |
|
|
|
|