Site Final | 11/9/2009 | 11/9/2009 | 11/9/2009 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 10/16/2009 | 10/16/2009 | 10/16/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 9/24/2009 | 9/24/2009 | 9/24/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 6/5/2009 | 6/5/2009 | 6/5/2009 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 2/24/2009 | 2/24/2009 | 2/24/2009 | P | PART |
Jim Storey
|
|
|
looks fine
|
Site Preparation | 1/7/2009 | 1/7/2009 | 1/7/2009 | | PART |
Clint A Smith
|
|
|
Left a message with the RP. Post ESC sign at the front gate of the lumber yard off of Production Ave. Provide a concrete wash out pit area for any further pours. All in all, site looks good. All materail kept organized. Trash container provided. No stabilized entrance required.
|
Issue & PRINT permit COM | | | 12/31/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Routing - Erosion and Sediment | 11/21/2008 | | 11/21/2008 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions.
|
Application received | | | 10/21/2008 | | |
|
|
|
|