Site Final | 3/23/2010 | 3/23/2010 | 3/23/2010 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 3/23/2010 | 3/23/2010 | 3/23/2010 | P | PASS |
Mike Jordan
|
|
|
Final stabalization is completed.
|
Site Final | 4/28/2009 | 4/28/2009 | 4/28/2009 | A | PART |
Eric Strole
|
|
|
site is not stablized, no landscape.
|
Site Final | 4/7/2009 | 4/7/2009 | 4/7/2009 | A | FAIL |
Mike Jordan
|
|
|
Final stabilization not done. Site is clean.
|
Site Final | 4/2/2009 | 4/2/2009 | 4/2/2009 | P | FAIL |
Mike Jordan
|
|
|
Needs to pick up const. trash. Final stabalization not done. No landscaping.
|
General Inspection | 4/1/2009 | 4/1/2009 | 4/1/2009 | A | PASS |
Jack Frank
|
|
|
site ok still needs landscaping
|
Random Inspection | 3/13/2009 | 3/13/2009 | 3/13/2009 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 3/11/2009 | 3/11/2009 | 3/11/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 3/11/2009 | 3/11/2009 | 3/11/2009 | A | CANC |
Mike Jordan
|
|
|
|
Random Inspection | 3/10/2009 | 3/10/2009 | 3/10/2009 | P | PASS |
Jack Frank
|
|
|
site cleaned up
|
General Inspection | 3/10/2009 | 3/10/2009 | 3/10/2009 | A | FAIL |
Jack Frank
|
|
|
talked to RP verbal clean hard surfaces
|
Random Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 | A | PART |
Jim Johnson
|
|
|
signage posted site look,s ok
|
Site Preparation | 3/5/2009 | 3/5/2009 | 3/5/2009 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 2/26/2009 | 2/26/2009 | 2/26/2009 | A | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 2/26/2009 | 2/26/2009 | 2/26/2009 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | PART |
Jim Storey
|
|
|
|
Issue & PRINT permit SFD | | | 2/20/2009 | | DONE |
|
|
|
|
Application received | | | 10/27/2008 | | |
|
|
|
|