Site Final | 4/6/2009 | 4/6/2009 | 4/6/2009 | A | PASS |
Eric Strole
|
|
|
|
General Inspection | 3/4/2009 | 3/4/2009 | 3/4/2009 | P | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
General Inspection | 3/4/2009 | 3/4/2009 | 3/4/2009 | P | PASS |
Eric Strole
|
|
|
|
Change Status (ISS) | | | 3/4/2009 | | DONE |
Tisha Gallop
|
|
|
per Clint S.
|
Random Inspection | 2/18/2009 | 2/18/2009 | 2/19/2009 | A | DONE |
Clint A Smith
|
|
|
Moved to a site final.
|
Site Final | 2/19/2009 | 2/19/2009 | 2/19/2009 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 2/18/2009 | 2/18/2009 | 2/18/2009 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 2/10/2009 | 2/10/2009 | 2/10/2009 | P | PASS |
Jim Storey
|
|
|
|
BMP Violation | 2/5/2009 | 2/5/2009 | 2/5/2009 | P | PASS |
Bill VanDegrift
|
|
|
di protected
|
BMP Violation | 2/3/2009 | 2/3/2009 | 2/3/2009 | P | FAIL |
Bill VanDegrift
|
|
|
move di protection to west side
|
BMP Violation | 2/2/2009 | 2/3/2009 | 2/2/2009 | A | CANC |
Eric Strole
|
|
|
|
General Inspection | 1/30/2009 | 2/2/2009 | 2/2/2009 | A | FAIL |
Eric Strole
|
|
|
esc sign is posted, di is still not protected, left verbal & written correction, will reinspect 2-3-08
|
Site Preparation | 1/30/2009 | 1/30/2009 | 1/30/2009 | | PART |
Eric Strole
|
|
|
spoke with rp about installing di protection, posting esc sign & having a concrete washout before any concrete pouring. will reinspect 2-02-09. rp said he will have it complete by days end.
|
General Inspection | 1/30/2009 | 1/30/2009 | 1/30/2009 | A | CANC |
Eric Strole
|
|
|
|
Issue & PRINT permit COM | | | 1/23/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Routing - Erosion and Sediment | 12/1/2008 | | 12/1/2008 | | DONE |
Tim L. Woodard
|
|
|
Waiver Letter approved. Applicant must comply with attached conditions. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/1/2008 | | DONE |
|
|
|
|
Application received | | | 11/3/2008 | | |
|
|
|
|