Site Final | 3/18/2010 | 3/18/2010 | 3/18/2010 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 3/18/2010 | 3/18/2010 | 3/18/2010 | P | PASS |
Dave Hannah
|
|
|
|
Tracking Control | 4/9/2009 | 4/10/2009 | 4/10/2009 | A | PASS |
Dixie Fellows
|
|
|
check plastic buckets and organge fencing..the garbage has been cleaned up
|
Site Final | 4/9/2009 | 4/9/2009 | 4/9/2009 | P | FAIL |
Dave Hannah
|
|
|
needs to landscape yaed
|
Random Inspection | 4/9/2009 | 4/9/2009 | 4/9/2009 | A | PEND |
Dixie Fellows
|
|
|
nate --asked nate to clean up plastic buckets and orange fencing...i ask him about the landscaping and he said the home owners are waiting on their landscaper to get plans back
|
General Inspection | 4/6/2009 | 4/6/2009 | 4/6/2009 | A | PASS |
Pat Lass
|
|
|
looks ok
|
Random Inspection | 3/27/2009 | 3/27/2009 | 3/27/2009 | P | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 3/23/2009 | 3/23/2009 | 3/23/2009 | P | PASS |
Dixie Fellows
|
|
|
WIP...SITE CLEAN
|
General Inspection | 3/2/2009 | 3/2/2009 | 3/2/2009 | P | PASS |
Daryl Spivey
|
|
|
site clean............ds
|
General Inspection | 2/19/2009 | 2/24/2009 | 2/24/2009 | A | PASS |
Clint A Smith
|
|
|
|
Complaint Inspection | 2/19/2009 | 2/19/2009 | 2/19/2009 | P | PART |
Clint A Smith
|
|
|
Verbal to RP and Notifed the complaintee over the outcome with the RP. 1. Build a berm along fence line to pervent erosion from the the neighbors lot onto there project. 2. Clean up all hard surfaces of sediment and debris. 3. Pick up trash and place into the container. Will re-inspect on 2/24/09AM.
|
Random Inspection | 2/9/2009 | 2/9/2009 | 2/9/2009 | P | PART |
Dave Hannah
|
|
|
site looks much better sidewalks are cleaned up still have some durt on road contractor will clean up
|
Random Inspection | 2/6/2009 | 2/6/2009 | 2/6/2009 | P | FAIL |
Dave Hannah
|
|
|
site is a mess dirt on sidewalk and some on road told contractor to clean up site I will reinspect monday at insulation inspection
|
Random Inspection | 1/21/2009 | 1/21/2009 | 1/21/2009 | P | PASS |
Daryl Spivey
|
|
|
|
Site Preparation | 11/26/2008 | 11/26/2008 | 11/26/2008 | P | PART |
Tony Young
|
|
|
will sweep at end of day
|
General Inspection | 11/21/2008 | 11/24/2008 | 11/24/2008 | A | PART |
Clint A Smith
|
|
|
Need to maintain D.I.
|
Site Preparation | 11/21/2008 | 11/21/2008 | 11/21/2008 | | FAIL |
Clint A Smith
|
|
|
Left a message with RP. Install protection on the storm drain on the 24th and Bannock. Removal all sediment and debris offo of sidewalks and gutterpan. Will re-inspect on 11/24/08 AM
|
General Inspection | 11/18/2008 | 11/18/2008 | 11/18/2008 | P | PASS |
Pat Lass
|
|
|
looks good
|
Issue & PRINT permit SFD | | | 11/14/2008 | | DONE |
|
|
|
|
Application received | | | 11/10/2008 | | |
|
|
|
|