Aging Inspection | 11/18/2010 | 11/18/2010 | 11/18/2010 | | DONE |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 11/18/2010 | 11/18/2010 | 11/18/2010 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 2/17/2009 | 2/23/2009 | 2/23/2009 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 2/13/2009 | 2/17/2009 | 2/17/2009 | A | PASS |
Clint A Smith
|
|
|
All issues dealt with.
|
BMP Violation | 2/12/2009 | 2/13/2009 | 2/13/2009 | P | DONE |
Clint A Smith
|
|
|
Contractors and Public Works said that by the end of the day that issues will be corrected. Will re-inspect on 2/17/09AM
|
Random Inspection | 2/12/2009 | 2/12/2009 | 2/12/2009 | P | FAIL |
Clint A Smith
|
|
|
Verbal correction to RP: 1. Containerize all trash debris being stockpiled with the staging area. 2. Protect opening to the irragation 10" colverts that feed into the irragation canal. Will re-inspect on 2/13/09 PM.
|
Site Preparation ESC | 11/21/2008 | 11/21/2008 | 11/21/2008 | | PASS |
Clint A Smith
|
|
|
|
Telephone call | | | 11/14/2008 | | DONE |
Cathy Brown
|
|
|
tlk to pete wilson ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 11/14/2008 | | DONE |
Cathy Brown
|
|
|
|
Issue & PRINT permit SFD | | | 11/14/2008 | | DONE |
|
|
|
|
Application received | | | 11/13/2008 | | |
|
|
|
|
Routing - Erosion and Sediment | 11/13/2008 | | 11/13/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/13/2008 | | |
|
|
|
|
Routing - Erosion and Sediment | 11/13/2008 | | | | |
Clint A Smith
|
|
|
|