Site Preparation | 3/27/2009 | 3/27/2009 | 3/27/2009 | P | PASS |
Jim Sly
|
|
|
|
Site Final | 3/27/2009 | 3/27/2009 | 3/27/2009 | P | PASS |
Jim Sly
|
|
|
OK
|
General Inspection | 3/27/2009 | 3/27/2009 | 3/27/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | CANC |
Bob Reichert
|
|
|
did not go on this inspection
|
General Inspection | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
General Inspection | 2/23/2009 | 2/24/2009 | 2/24/2009 | A | PASS |
Jim Sly
|
|
|
|
General Inspection | 2/23/2009 | 2/23/2009 | 2/23/2009 | P | CANC |
Jim Sly
|
|
|
Re-sched...
|
General Inspection | 2/23/2009 | 2/23/2009 | 2/23/2009 | A | PASS |
Jack Frank
|
|
|
ok
|
General Inspection | 2/20/2009 | 2/20/2009 | 2/20/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Site Preparation | 1/9/2009 | 1/9/2009 | 1/9/2009 | P | FAIL |
Jim Sly
|
|
|
Called RP...Need to sweep street, gutter and driveway.....will check at foundation inspection.
|
Application received | | | 12/17/2008 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 12/17/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|