Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC08-01050
StatusFinaled
Name GENE LANDON
Site Address 5521 E WARM SPRINGS AVE
Project NameRiverstone International Lower
Customer Number 
ePlanReview 
Description
Grading and Drainage ONLY.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection ESC6/1/20106/1/20106/1/2010 DONE
DetailsClint A Smith
All work is completed and stabilized.
DOC - Permit Finaled6/1/20106/1/20106/1/2010PPASS
DetailsClint A Smith
Tracking Control3/23/20103/24/20103/24/2010PPART
DetailsClint A Smith
Cleaning up on a daily basis.
Complaint Inspection3/23/20103/23/20103/23/2010PFAIL
DetailsClint A Smith
Verbal to RP.
Make sure that by the end of the day to clean all sediment and debris off of all hard surfaces. Will follow up on 3/24/10 PM.
Aging Inspection3/23/20103/23/20103/23/2010PCANC
DetailsClint A Smith
Random Inspection12/15/200912/15/200912/15/2009APASS
DetailsClint A Smith
General Inspection10/20/200910/20/200910/20/2009APASS
DetailsClint A Smith
Random Inspection10/5/200910/5/200910/5/2009APASS
DetailsClint A Smith
Removed the exit at Warnsprings to the west of the project through the RiverStone school.
Random Inspection9/17/20099/17/20099/17/2009APASS
DetailsClint A Smith
Tracking Control9/2/20099/4/20099/4/2009APASS
DetailsEric Strole
Random Inspection9/2/20099/2/20099/2/2009APART
DetailsEric Strole
left verbal correction with rp to maintain construction entrance do to trackout starting to accure.
BMP Violation8/18/20098/21/20098/21/2009APASS
DetailsEric Strole
Random Inspection8/18/20098/18/20098/18/2009AFAIL
DetailsEric Strole
left verbal correction with gc that he needs to change rp to other then rp listed being he is no longer on project and clean up concrete spoils and put in washout area by 8-20-09 pm.
Random Inspection7/30/20097/31/20097/31/2009APASS
DetailsEric Strole
site looks good.
Random Inspection5/21/20095/21/20095/21/2009APASS
DetailsClint A Smith
Random Inspection5/11/20095/11/20095/11/2009PPART
DetailsSteven Webb
Informed RP-J.C. that concrete washout is in need of maintance. Overall site looks good.
Tracking Control5/7/20095/11/20095/11/2009APASS
DetailsClint A Smith
BMP Violation5/5/20095/7/20095/7/2009AFAIL
DetailsClint A Smith
Correction Notice:
Clean up all hard surface of all sediment and debris offo of hard surfaces. Will re-inspect on 5/11/09AM.
Tracking Control5/5/20095/5/20095/5/2009AFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all tracking onto Warm Springs Rd. by the end of the day.
Then by 5/6/09 PM widen construction entrance to pervent further tracking. Will re-inspect on 5/7/09AM
Random Inspection4/30/20094/30/20094/30/2009APASS
DetailsDaryl Spivey
General Inspection4/21/20094/21/20094/21/2009APASS
DetailsClint A Smith
All actvities are compliant at this time.
BMP Violation4/13/20094/15/20094/15/2009APASS
DetailsClint A Smith
BMP Violation4/13/20094/13/20094/13/2009AFAIL
DetailsClint A Smith
Verbal to RP:
Provide a concrete washout pit for prior to any further concrete pours on site. Clean up concrete spoils from washing out into a proper washout pit once provided. Will re-inspect on 04/15/09 AM.
General Inspection4/9/20094/9/20094/9/2009APASS
DetailsMike Kinnear
sign posted site looks fine
General Inspection4/7/20094/7/20094/7/2009PPASS
DetailsMike Kinnear
sign posted site looks fine
General Inspection4/7/20094/7/20094/7/2009PPART
DetailsClint A Smith
Verbal to RP:
Maintain construction entrance by roughening it.
BMP Violation3/16/20093/18/20093/18/2009APART
DetailsClint A Smith
All issue have been dealt with and corrected. Told RP to stay on top of tracking due to the off hauling that is occuring.
Site Preparation3/16/20093/16/20093/16/2009 FAIL
DetailsClint A Smith
Verbal to RP:
1.Post ESC sign at the front entrance of project.
2. Install all sediment barriers perindustry standards.
3. Widen and lengthen the construction access.
4. Clean up all tracking off of construction access.
Will re-inspect on 3/18/09 AM.
Issue & PRINT permit COM  3/9/2009 DONE
DetailsBarbara Stitt
Permit Ready to Issue  3/6/2009 DONE
DetailsBarbara Stitt
Routing - Erosion and Sediment3/3/2009 3/3/2009 PASS
DetailsClint A Smith
ESC plan approved by SGW on 01/16/09 with attached conditions.
Routing - Erosion and Sediment1/16/2009 1/16/2009 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. PD stated that the area of disturbance is 4.2 acres not 3.5 as listed on ESC application.
Application received  12/31/2008